Addendum 5 - 20210205 <br />31. Bid Item 425-2-72 MH, J-7, >10. Please provide structure information for S-2000 which is on the 66" RCP. <br />Rim 24.59, West Invert 13.10, East Invert 13.09, Sump 11.10. Structure information is being added to the <br />plans. <br />32. Bid item 425-1-451, Inlet, Curb, Type J-5, <10. There are only 3 ea. not 5, the other two are the conflict <br />structures, item IRC 3. <br />The itemized bid schedule has been revised and will be issued with addendum 6. <br />33. Bid item 425-1-521 Inlet, Dt Bot, Type C, <10. There are 8 ea. not 6, structures FD -344 and FD -798 are <br />shown in the drainage structure sheets but not in the quantities. <br />The itemized bid schedule has been revised and will be issued with addendum 6. <br />34. On plan sheet 38 there shows 64 If of 72" RCP with no bid item? <br />The itemized bid schedule has been revised to include a pay item for a 72" RCP and will be issued with <br />addendum. <br />35. There are no end treatments shown for the 48" x 76" ERCP, 66" RCP, and the 72" RCP, please.advise? Class <br />II Concrete and reinforcing steel? <br />David Gunter with IRFWCD has requested that rip rap bank protection be included on all outfalls into <br />IRFWCD facilities. Plans are being amended and quantity of rip rap has been increased to 1156 tons. <br />36. Bid Item 400-1-2, Class I Concrete, Endwalls. There is actually 17.5 cy and not 8? EW -328 36" CEW is 4.53 <br />cy. EW -322 30" CEW is 3.26 cy. EW -346 18" CEW is 1.56 cy. Lastly EW -343 48" CEW is 8.15 cy. <br />The itemized bid schedule has been revised to 17cy for item 0400 12. <br />37. Reference Roadway 1B Sheet 24 Summary of Drainage Structures shows a project total plan quantity of <br />39.6 CY of 66" Concrete End Wall, compared to Bid Item 400-2-2 with 125.6 CY, please review and provide <br />correct quantity. <br />The quantity associated with pay item 400-2-2 includes 66" endwalls, as well as headwalls associated <br />with 69th Street RCBC. <br />38. Reference Roadway 1A Sheet 16 Summary of Drainage Quantities shows a grand total of 15.94 CY of Class I <br />Concrete End Wall, compared to Bid Item 0400 12 with 8 CY, please review and provide correct quantity. <br />The itemized bid schedule has been revised to 17cy for item Bid Item 040012. <br />39. The specs indicate that a Builders Risk Policy may be required. We have never had a builder's risk policy for <br />roadwork or any bridge work. This looks like it may be something that was unintended for this project. <br />We will remove the Builders Risk Policy from the requirements. <br />40. The plans do not indicate any temporary post tension of the 66th avenue bridge over the north relief canal. <br />If this is the case how much time is being allowed to close 66th Ave. If it is an accelerated amount of time, <br />please allow for a 7 day a week work schedule. <br />Traffic (1 lane in each direction).shall be maintained on 66th Ave at all times. <br />41. Are all waterways on this project considered Florida Outstanding waterways? <br />All waterways directly connect to an Outstanding Florida Waterway (Indian River Lagoon). Therefore, <br />requirements of turbidity are subject to being treated as a Florida Outstanding Waterway. <br />Page 5 of 9 <br />