My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-052B
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-052B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:38:34 PM
Creation date
5/6/2021 12:26:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/06/2021
Control Number
2021-052B
Agenda Item Number
12.G.2.
Entity Name
Halley Engineering Contractors, Inc.
Subject
Award of Bid No. 2021018 for Construction of 66th Ave Roadway Widening
Area
(49th St. to 69th Street),
Project Number
IRC-1505
Bid Number
2021018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum 5 - 20210205 <br />Hours. The Contractor can request to work outside regular work hours. Granting permission will depend <br />on inspection staff availability, MOT requirements, sufficient lighting, and safety of the public. <br />57. Addendum #1 is missing auger boring reports for the Roadway section 1A (starts at AB -44 see 53`d St, etc.). <br />Please advise. <br />Additional Soil profiles are included with Addendum No. S. <br />58. We were under the impression boring reports and recommendations were also to be issued for Roadway <br />section 1B? Please advise. <br />The Roadway Soil Report "66th Avenue Roadway Widening, 500 feet North of 57th Street to Barber <br />Street" by Dunkelberger Engineering and Testing, Inc., April 25, 2007 has been attached to Addendum S. <br />59. Phase 1B has a pay item for mailbox F&I; however, phase 1A does not have a pay item for this scope, will <br />there be a line item added for mailbox F&I for Phase 1A or will this be an incidental item? Please advise. <br />We have added a line item for mailbox F&I for Phase 1A. <br />60. Phase 1A, Pay Item No. 0514 712 PLASTIC FILTER FABRIC, STABILIZATION: is this referring to the Plastic <br />Erosion mat noted on 1A Roadway Drawing sheet #19 "Detail of Fill at Lateral or Sublateral Canals"? If not, <br />please confirm where this plastic fabric is located. <br />Pay item 0530 3 3 requires the filter fabric and bedding stone be included in the unit price bid for rip rap <br />rubble. <br />61. Will the County be able to provide coring data? <br />There is no coring data available for this project. <br />62. Will the County be able to provide a pay item for color treated & stamped concrete treatment per detail <br />sheet 20 of the Roadway Phase 1a Plans? Or will this be an incidental item for the 6" concrete sidewalk? <br />The pay item for color treated concrete is 0523 2 — Patterned Pavement, Concrete, Non -Vehicular Areas. <br />63. Could you please clarify what concrete mixes are required for this project? I have had bidders contacting <br />me for quotes on concrete and some are asking for DOT Mixes others are asking for GOV mixes which are <br />the same as DOT but do not include the D1 ticket and others are requesting just regular concrete for the <br />project. There is a substantial price difference between regular concrete and DOT mixes. When we supplied <br />the concrete on the first PH of 66th Ave we supplied GOV mixes to the contractors that did the curbs, <br />sidewalks and bridges. If you have any questions please let me know. <br />This project follows FDOT Specifications, therefore all concrete mixes shall be approved FDOT mixes. <br />64. Does the County have a Utility Work Schedule for the of the remaining power poles that need to be <br />relocated? <br />FPL is on notice and the successful contractor will need to coordinate with FPL. <br />65. Will the millings of the existing road demo belong to the County? <br />Millings are to be delivered to Indian River County Road & Bridge Department, 4550 41" Street, Vero <br />Beach. <br />Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.