Laserfiche WebLink
Addendum 5 - 20210205 <br />Hours. The Contractor can request to work outside regular work hours. Granting permission will depend <br />on inspection staff availability, MOT requirements, sufficient lighting, and safety of the public. <br />57. Addendum #1 is missing auger boring reports for the Roadway section 1A (starts at AB -44 see 53`d St, etc.). <br />Please advise. <br />Additional Soil profiles are included with Addendum No. S. <br />58. We were under the impression boring reports and recommendations were also to be issued for Roadway <br />section 1B? Please advise. <br />The Roadway Soil Report "66th Avenue Roadway Widening, 500 feet North of 57th Street to Barber <br />Street" by Dunkelberger Engineering and Testing, Inc., April 25, 2007 has been attached to Addendum S. <br />59. Phase 1B has a pay item for mailbox F&I; however, phase 1A does not have a pay item for this scope, will <br />there be a line item added for mailbox F&I for Phase 1A or will this be an incidental item? Please advise. <br />We have added a line item for mailbox F&I for Phase 1A. <br />60. Phase 1A, Pay Item No. 0514 712 PLASTIC FILTER FABRIC, STABILIZATION: is this referring to the Plastic <br />Erosion mat noted on 1A Roadway Drawing sheet #19 "Detail of Fill at Lateral or Sublateral Canals"? If not, <br />please confirm where this plastic fabric is located. <br />Pay item 0530 3 3 requires the filter fabric and bedding stone be included in the unit price bid for rip rap <br />rubble. <br />61. Will the County be able to provide coring data? <br />There is no coring data available for this project. <br />62. Will the County be able to provide a pay item for color treated & stamped concrete treatment per detail <br />sheet 20 of the Roadway Phase 1a Plans? Or will this be an incidental item for the 6" concrete sidewalk? <br />The pay item for color treated concrete is 0523 2 — Patterned Pavement, Concrete, Non -Vehicular Areas. <br />63. Could you please clarify what concrete mixes are required for this project? I have had bidders contacting <br />me for quotes on concrete and some are asking for DOT Mixes others are asking for GOV mixes which are <br />the same as DOT but do not include the D1 ticket and others are requesting just regular concrete for the <br />project. There is a substantial price difference between regular concrete and DOT mixes. When we supplied <br />the concrete on the first PH of 66th Ave we supplied GOV mixes to the contractors that did the curbs, <br />sidewalks and bridges. If you have any questions please let me know. <br />This project follows FDOT Specifications, therefore all concrete mixes shall be approved FDOT mixes. <br />64. Does the County have a Utility Work Schedule for the of the remaining power poles that need to be <br />relocated? <br />FPL is on notice and the successful contractor will need to coordinate with FPL. <br />65. Will the millings of the existing road demo belong to the County? <br />Millings are to be delivered to Indian River County Road & Bridge Department, 4550 41" Street, Vero <br />Beach. <br />Page 8 of 9 <br />