Laserfiche WebLink
Addendum 5 - 20210205 <br />66. Please clarify is the intent of the Plans is to use Color Treated & Stamped Concrete per detail sheet #20 of <br />the Arcadis Plans or Pay Item 523-2 Patterned Pavement Concrete, Non -Vehicular (no details for this item <br />on the plans)? <br />Yes, this is the correct pay item. <br />67. Can you provide the plans for project 0907 by Carter Associates Inc. that they tell us to reference on sheet <br />44 of 112 of the Phase 1A plans? <br />Plans are provided with this Addendum. <br />The updated Itemized Bid Schedule will be provided with Addendum 6. <br />Attachments: <br />- Bridge Inspection Report for 66th Ave over North Relief Canal, Bridge Structure ID: 880006 <br />- Geotechnical Services Report, Sadwani Pond for 66th Avenue Roadway Widening, December 12, 2007, <br />prepared by Dunkelberger Engineering & Testing Inc. <br />- Roadway Soil Survey, 66th Avenue Roadway Widening, 500 feet North of 57th Street to Barber Street, April <br />25, 2007, prepared by Dunkelberger Engineering & Testing Inc. <br />- As -Built Plans, 66th Avenue Roadway Improvements, IRC project No. 0907 by Carter Associates, Inc. <br />- Updated Sheets 66th Avenue Roadway Widening, Phase 1B, sheet 11, 62, 63, 178, 179, 217. <br />Page 9 of 9 <br />