Laserfiche WebLink
I <br />co <br />67 <br />Indian River County Enhancement Projects <br />1994 1 <br />1994 <br />MPO Project 1994 School District <br />Rank Description Cost <br />PSidewalk <br />r:orit <br />rr <br />. . . . . . . . . . . . <br />2 Causeway Indian River Blvd: 81 bikepath from 17th St to Royal Palm Blvd & $162 <br />Connector Royal Palm Place <br />Royal Palm Blvd: 51 sidewalk from Indian River Blvd to 23rd <br />St/Royal Palm Place intersection <br />Royal Palm Place: 51 sidewalk from Indian River Blvd to 23rd <br />St/Royal Palm Place intersection <br />23rd St: 51 sidewalk from Royal Palm Blvd & Royal Palm Place to <br />existina 23rd St sidewalks <br />3 South County 8' bikepaths and 51sidewalks. $1,242,498 1 <br />Recreation 20th Ave, 27th Ave, 5th St SW, 4th St, 9th St SW, South US 1, (Oslo Middle) <br />Network Highlands Drive <br />(some segments of this project are being constructed by the County 3 <br />in 1995 using local funds) (Thompson <br />Elementary) <br />4 County CR 510: 4' paved shoulders from SR AlA to US 1 $432,432 -- <br />- Cyclists Loop 58th Ave: 41 paved shoulders from CR 510 to 69th St <br />5 Vero Beach/ 8th St: 51 sidewalk from 63rd Ave to 49th Ave, 51sidewalk 43rd Ave $579,616 4 <br />Glendale to US 1 (Glendale <br />Elementary 12th St: 51 sidewalk from 16th Ave to 12th Ave Elementary) <br />43rd Ave: 51 sidewalk from 12th St to 8th St <br />6 Gifford 58th Ave: 81 bikepath from 23rd St to 45th St $505,508 <br />-- <br />Commercial/ 45th St: 51 sidewalk from 58th Ave to 43rd Ave (would provide <br />Medical US 1: 51 sidewalk from 37th St to 45th St additional <br />Connector connection) <br />\U\k\b=\8nh94b=.th1 <br />I <br />