My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-166
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 12:38:46 PM
Creation date
11/2/2021 12:37:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/12/2021
Control Number
2021-166
Agenda Item Number
15.B.4.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work Order 44 for Landfill Gas Flare Skid Improvements and Pipeline Extension
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prepare progress summaries and review/process subconsultant contracts and <br />payment. <br />Subtask 1.3 Coordination with Heartland <br />The Consultant will work closely with the County and Heartland to review the overall <br />design, equipment specifications and construction plan of the evaporation system. The <br />Consultant will serve as the Owner's representative and will review the details of the <br />system integration between the Heartland Facility equipment and SWDD's proposed <br />landfill assets. This task will include the following activities: <br />■ Allocate and assign key engineering resources (such as controls, mechanical, and <br />process engineers) as necessary to support the project during critical design review <br />stages; <br />■ Review detailed drawings, calculations and other information submitted by the <br />Heartland engineering team. These may include natural gas and LFG piping <br />designs, mechanical piping drawings, electrical and controls designs for valves, <br />instruments and other electrical equipment that could affect the landfill assets. <br />■ Review the master project schedule and provide comments to SWDD regarding <br />risks in achieving critical milestones by the developer. Please note that to do this, <br />the Consultant will request monthly schedule updates from Heartland and provide <br />comments as necessary. <br />■ The Consultant will monitor the engineering and coordination performed by <br />developer/contractor of the facility. <br />■ The Consultant will review all design and equipment specifications regarding the <br />integration of piping with the landfill system. <br />■ Perform site visits if necessary (travel expenses to be invoiced as incurred for the <br />necessary number of site visits). <br />Task 2: Landfill Gas Skid Design <br />Design of the landfill gas skid modifications will include coordination with the RNG <br />(IRED) and evaporation system (Heartland Technologies) providers to ensure that the <br />proposed modifications meet the needs (pressure, moisture content, flow, etc.) of each <br />project. Anticipated modifications are as follows: <br />1. Coordination of integration and controls between the LFG skid and the evaporation <br />system, including automation suitable to adjust for operational changes by either <br />the landfill or evaporation system. Anticipate addition of various sensors, <br />modulating valves and a variable frequency drive. <br />2. New Control panel. <br />3. New high pressure blowers. <br />Design will include the preparation of: <br />■ Process and Instrumentation Diagrams (P&IDs) <br />■ Process flow diagram including high pressure blowers; <br />■ Detailed mechanical drawings for the blower system; <br />■ Structural drawings as necessary to support new installation; <br />Page 4 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.