Laserfiche WebLink
prepare progress summaries and review/process subconsultant contracts and <br />payment. <br />Subtask 1.3 Coordination with Heartland <br />The Consultant will work closely with the County and Heartland to review the overall <br />design, equipment specifications and construction plan of the evaporation system. The <br />Consultant will serve as the Owner's representative and will review the details of the <br />system integration between the Heartland Facility equipment and SWDD's proposed <br />landfill assets. This task will include the following activities: <br />■ Allocate and assign key engineering resources (such as controls, mechanical, and <br />process engineers) as necessary to support the project during critical design review <br />stages; <br />■ Review detailed drawings, calculations and other information submitted by the <br />Heartland engineering team. These may include natural gas and LFG piping <br />designs, mechanical piping drawings, electrical and controls designs for valves, <br />instruments and other electrical equipment that could affect the landfill assets. <br />■ Review the master project schedule and provide comments to SWDD regarding <br />risks in achieving critical milestones by the developer. Please note that to do this, <br />the Consultant will request monthly schedule updates from Heartland and provide <br />comments as necessary. <br />■ The Consultant will monitor the engineering and coordination performed by <br />developer/contractor of the facility. <br />■ The Consultant will review all design and equipment specifications regarding the <br />integration of piping with the landfill system. <br />■ Perform site visits if necessary (travel expenses to be invoiced as incurred for the <br />necessary number of site visits). <br />Task 2: Landfill Gas Skid Design <br />Design of the landfill gas skid modifications will include coordination with the RNG <br />(IRED) and evaporation system (Heartland Technologies) providers to ensure that the <br />proposed modifications meet the needs (pressure, moisture content, flow, etc.) of each <br />project. Anticipated modifications are as follows: <br />1. Coordination of integration and controls between the LFG skid and the evaporation <br />system, including automation suitable to adjust for operational changes by either <br />the landfill or evaporation system. Anticipate addition of various sensors, <br />modulating valves and a variable frequency drive. <br />2. New Control panel. <br />3. New high pressure blowers. <br />Design will include the preparation of: <br />■ Process and Instrumentation Diagrams (P&IDs) <br />■ Process flow diagram including high pressure blowers; <br />■ Detailed mechanical drawings for the blower system; <br />■ Structural drawings as necessary to support new installation; <br />Page 4 of 8 <br />