My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-166
CBCC
>
Official Documents
>
2020's
>
2021
>
2021-166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 12:38:46 PM
Creation date
11/2/2021 12:37:33 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
10/12/2021
Control Number
2021-166
Agenda Item Number
15.B.4.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work Order 44 for Landfill Gas Flare Skid Improvements and Pipeline Extension
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ Electrical drawings incorporating design for BFS; <br />■ A complete set of construction drawings for the procurement and construction of <br />the new BFS; <br />■ Controls integration and network drawings for the integration of the Heartland <br />Facility; and <br />■ Civil details for grading and drainage as needed. <br />Subtask 2.1 Request for Information <br />The Consultant will prepare a request for information needed to prepare the design and <br />support the preparation of a basis of design memorandum. Data requested will include, but <br />not be limited to, historical operational data of the LFG collection system and flare, <br />operational needs of the RNG project (IRED) and operational needs of the evaporation <br />system (Heartland). The Consultant will review and evaluate the data received to formulate <br />a basis of design memorandum, which will then be reviewed with SWDD staff in a virtual <br />meeting to gain concurrence prior to advancing to the design phase. <br />Subtask 2.2 30 Percent Design <br />The Consultant will prepare 30 percent plans detailing the proposed modifications. Two <br />11 x 17 hardcopy sets of review documents will be provided to the County along with an <br />electronic (PDF format) copy. A review meeting will be conducted with SWDD staff to <br />capture comments and concerns relative to the proposed 30 percent design to ensure the <br />design is compatible with the proposed RNG and evaporation system projects. Comments <br />received will be documented and incorporated as appropriate for use in preparing the 60 <br />percent design documents. <br />Subtask 2.3 60 Percent Design <br />The Consultant will prepare 60 percent plans and specifications to serve as the bid package <br />for use by the County in soliciting competitive bids for construction of the project. The 60 <br />percent design will incorporate comments received on the 30 percent design and will also <br />include detailed design of civil (paving, grading, drainage), structural, electrical, <br />instrumentation (based on information provided by others), demolition, tree relocations and <br />site restoration components (if needed). Environmental services related to surface water <br />impacts, gopher tortoise relocation, etc. are not included in this scope of services. These <br />services can be provided, if needed, under separate authorization or amendment to this <br />Work Order. Two full size sets of plans and two hardcopy sets of draft technical <br />specifications will be provided, along with an electronic copy (PDF format) for the <br />County's review. <br />A design review meeting will be conducted with SWDD staff to discuss comments on the <br />60 percent design documents. Comments received will be documented and incorporated as <br />appropriate for use in preparing the 90 percent design documents. <br />Subtask 2.4 90 Percent Design and Final Bid Package <br />The Consultant will incorporate comments received during the 60 percent review and <br />advance the plans and specifications to the 90 percent completion level. Two full size sets <br />Page 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.