My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-082
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-082
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2022 3:30:26 PM
Creation date
6/8/2022 3:08:37 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/03/2022
Control Number
2022-082
Agenda Item Number
8.G.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Contract for Resurfacing 69th Street from 66th Avenue to SR5/US-1
FM No.438073-1-54-01
Project Number
IRC 1639
Bid Number
2022-028
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1— General Requirements, IRC -1639 <br />SECTION 01024 - FORCE ACCOUNT <br />1 1 rFNFRQI <br />A. CONTRACTOR shall furnish all labor, materials, equipment and incidentals necessary to <br />perform additional work not covered on the Contract Drawings. The force Account is <br />intended as a contingency for unforeseen work. <br />1.2 PAYMENT <br />A. Lump sum amount for force account work is included in the bid schedule. The value of force <br />account work will be determined in accordance with Article 12 of the General Conditions. <br />+ + END OF SECTION + + <br />Force Account - 01024-1 <br />F:\PublicWorkskENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />1 GENERAL REQUIREMENTS - 20211207.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.