Laserfiche WebLink
Division 1— General Requirements, IRC -1639 <br />SECTION 01050 - FIELD ENGINEERING AND LAYOUT <br />1 1 t;FNIFRAI <br />A. The CONTRACTOR will furnish all construction staking for the project. All staking from <br />control will be under the supervision of a Florida Registered Land Surveyor. <br />B. Develop and make all detail surveys and measurements needed for construction including <br />but not limited to, slope stakes, batter boards, piling layouts and all other working lines, <br />elevations and cut sheets. <br />C. Keep a transit and leveling instrument on the site at all times and a skilled instrument man <br />available whenever necessary for layout of the Work. <br />D. Provide all material required for benchmarks, control points, batter boards, grade stakes, <br />and other items. <br />E. Be solely responsible for all locations, dimensions and levels. No data other than written <br />orders of the ENGINEER shall justify departure from the dimensions and levels required by <br />the Drawings. <br />F. Safeguard all points, stakes, grademarks, monuments and benchmarks made or established <br />on the Work, and reestablish same, if disturbed. Rectify all Work improperly installed <br />because of not maintaining, not protecting or removing without authorization such <br />established points, stakes, marks and monuments. <br />G. When requested by the ENGINEER, provide such facilities and assistance as may be <br />necessary for the ENGINEER to check line and grade points placed by the CONTRACTOR. Do <br />no excavation or embankment work until all cross -sectioning necessary for determining pay <br />quantities has been completed and checked by the ENGINEER. <br />H. The cost of performing engineering and layout work described above shall be included in <br />the contract unit prices for the various items of work to which it is incidental. No separate <br />payment will be made for surveying or engineering. <br />1.2 SURVEY WORK AND QUALIFICATIONS OF SURVEYOR <br />A. Prior to commencing work, the CONTRACTOR shall satisfy himself as to the accuracy of all <br />survey and existing site information as indicated in the Contract Documents. Immediately <br />notify the ENGINEER upon discovery of any errors, inaccuracies or omissions in the survey <br />data. The commencing of any of the work by the CONTRACTOR shall be held as the <br />CONTRACTOR's acceptance that all survey or existing site information is correct and <br />accurate, without any reasonably inferable errors, inaccuracies or omissions. <br />Field Engineering and Layout - 01050-1 <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1-Admin\Bids\Bid Documents - Advertisement\DIV <br />1 GENERAL REQUIREMENTS - 20211207.docx <br />