Mowing is included in the Mobilization Pay Item No. 101-1. <br />15. How will the proposed cross slope match the existing roadway? <br />The transition from the proposed roadway cross slope to the existing roadway slope will occur within a <br />distance of approximately 50 -feet from the connection to the existing roadway. <br />16. What work does the pay item for Mail Box (F&I) include? <br />The existing mail box will be removed and replaced with a new mail box. However, coordination with the <br />property owner will be required to confirm they agree with the replacement. <br />17. What Pay Item is demolition of pipe, concrete, and asphalt included? <br />Demolition of pipe, concrete, and asphalt is included in the Clearing and Grubbing Pay Item No. 110-1-1. <br />18. The Detail M-2 referenced on the plans for restoration of pavement over piping is missing? <br />Plan Sheet -38A, Miscellaneous Detail with Detail M-2 is attached with Addendum 2. <br />19. Will the FDR Asphalt Emulsion and Portland Cement be separate pay items from the FDR Pay Item? <br />New Pay Items No. 283-1 for the Asphalt Emulsion and No. 283-2 for the Portland Cement have been added <br />to the Itemized Bid Schedule and Plan Sheet -4, Summary of Pay Items and are included with Addendum 2. <br />Attachments: <br />Meeting Minutes of Pre -Bid Meeting held on March 16, 2022, including Sign -In sheet <br />Revised Itemized Bid Schedule—Addendum 1 <br />Revised Plan Sheet -4, Summary of Pay Items <br />Revised Plan Sheet -38A, Miscellaneous Detail <br />Lost Tree Preserve Offsite Improvement Plans <br />Bid Plans in AutoCAD format <br />Page 3 of 3 <br />F:\PW-Purchasing\IRC-1639\Addendum 2\IRC-1639_ADDENDUM2.doc <br />