Page 5 of 7 <br />and Grubbing doesn't include the cut section calculation for the road widening and that <br />excavation pay item has been calculated to include the shoulder surface to the bottom of <br />the proposed should widening typical section. <br />• Tim Rose asked if the contractor is required to take core samples before they submit a bid. <br />Brian Good clarified the purpose of the referenced language is allow the Contractor to take <br />samples in the event that the Contractor wants to propose an alternative design to what <br />is already approved for the project. James Ennis added that there will be no compensation <br />for the core sampling, and the Contractor will assume any risk for testing. Coordination <br />with the County must take place prior to coring the roadway, and the Contractor will be <br />responsible for roadway restoration. <br />• Zach Rose asked for confirmation that the road can be closed. Brian Good stated the <br />Maintenance of Traffic Plan is the responsibility of the Contractor and road closures would <br />need to be submitted to and approved by the County. James Ennis clarified that the <br />temporary lane closure language is intended for closures outside of the mixing operation. <br />Road closures will be allowed, conditional to the approval of the project specific MOT plan, <br />to take place during the mixing operation under the condition that local access is <br />maintained. A full closure of 69th Street from 66th Avenue to Lost Tree Village will not be <br />allowed. Full closures will need to be done in sections so as to allow reasonable traffic <br />maintenance. <br />• A field office will not be required for this project and will be specified in an addendum. <br />• James Ennis confirmed that project station markers are required every 100' throughout <br />the project. This is also specified within the contract at Section 01050 — Field Engineering <br />and Layout, 1.3 Station Boards, A. <br />• Zach Rose asked if the Contractor that will do the directional drilling has to have five years <br />of experience can be a General Contractor. The Contractor that performs the directional <br />drilling should have experience performing this type of work. <br />• Brian Good clarified the concrete for the sidewalk shall be fiber mesh reinforced and have <br />a minimum strength of 3,000 psi. <br />• Rob Morris (FP&L) stated their pole relocations, for a section of the project from STA. <br />199+60 to STA. 209+50 will be against the right of way. All of the vegetation will need to <br />be cleared and anything that overhangs in the right of way will need to be trimmed and <br />everything removed as FP&L doesn't perform that type of work. Kirstin Leiendecker stated <br />that FP&L will be required to coordinate with the Contractor to perform and complete <br />their work. A question was asked if there was a Utility Work Schedule so as to assure <br />against any delays in the Contractor's work. Rob Morris stated their permit for the work <br />is forthcoming and their work will be performed in a timely manner once they know when <br />the project begins. James Ennis stated that once the Notice to Proceed is issued, the <br />Contractor is expected to proceed with erosion control installation along with clearing & <br />grubbing in such a manner that allows for FPL to proceed with their utility relocations as <br />soon as possible. <br />• Brian Good stated that in addition to other utilities, the plans reflect a deflection of a <br />proposed waterline under an existing AT&T fiber line and it is at the northeast corner of <br />58th Avenue and 69th Street. <br />• David Gunter stated there is a canal maintenance road on the east side of the Lateral G <br />Canal that is also posted with a street sign as 46th Court which serves as access for several <br />residences. Mr. Gunter noted that this is a private road and should not be used for any <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1639 69th Street 66th Avenue to US -1 Resurfacing (SCOP)\1- <br />Admin\Meetings\PreBid\IRC-1639_PREBID_MIN_ 20220316.docx <br />