Laserfiche WebLink
Contract Terms and Conditions <br />222209954,0 <br />1.2.3.3. The Project Manager may authorize the Contractor to provide services that are not covered by <br />the bid line items. The Project Manager shall coordinate the processing of a release purchase order <br />utilizing the allowance in the last line item of the contract pricing pages. The Contractor shall not <br />commence any services until receipt of a processed release purchase order from the Project Manager. The <br />Project Manager will also review quotes provided for other county agencies prior to use of this contract. <br />1.3. Minimum Qualifications * <br />1.3.1. The Bidder/Proposer or principal thereof shall demonstrate recent experience in providing substantially <br />similar services within the past three (3) year(s) to public entities in the State of Florida with populations of at least <br />100,000 people. The Bidder/Proposer shall provide at least three (3) contracts that can verify the Bidder has <br />completed or is currently working on substantially similar projects. The "Responsibility Survey" should be used by <br />the Bidder/Proposer to provide such information. If the Bidder/Proposer uses its own form, the information provided <br />must be substantially similar as requested in the Responsibility Survey. <br />1.3.2. The Bidder/Proposer shall at the time of the Bid opening and, during the contract period, own, operate and be <br />the primary contractor of a U.S. Environmental Protection Agency/Florida Department of Environmental Protection <br />(FDEP) licensed hazardous waste transfer, storage, and/or disposal facility (TSDF) within the State of Florida. <br />1.3.3. The Contractor's Chemist/Supervisor shall have at a minimum, a 2 -year degree with a Major or Minor in <br />Chemistry or related science field, or at least two (2) years' experience in the hazardous waste field and one year of <br />this experience in a supervisory capacity. The Chemist/Supervisor, and all the Contractor's on-site personnel, shall <br />be certified as having forty (40) hours of Occupational Safety and Health Administration (OSHA) -approved <br />Hazardous Waste Operations and Emergency Response (HAZWOPER) training, and remain certified during the <br />term of the contract. <br />1.4. Minimum Requirements * <br />1.4.1. Within thirty (30) days of the contract award, the Contractor shall submit a Waste Disposal Site List that shall <br />include all ultimate disposal sites in the United States with a copy of permit of all facilities used during this <br />Contract. All hazardous waste disposed of with this Contract shall be disposed of in the United States. <br />1.4.1.1. The Waste Disposal Site List shall include the name, address, telephone number, and disposal <br />method(s) of each disposal site, and shall detail the type of waste(s) the Contractor shall dispose of at <br />each site. <br />1.4.1.1.1. If any hazardous waste has to be disposed of outside of the United States, a written <br />letter shall be submitted to the Project Manager and authorized in writing by Hillsborough <br />County Solid Waste Management Department prior to disposal. <br />1.4.1.1.2. No additional or alternate disposal sites shall be utilized by the Contractor for <br />services within the scope of this Contract without written authorization from the County. <br />Hillsborough County Board of County Commissioners Page 25 of 61 <br />