Laserfiche WebLink
( approximately 1600 acres. Pumping Station #3 will ultimately <br />serve the Roseland area to the north and west of the FEC <br />I <br />Railroad, the St. Sebastian planned unit development, the <br />Sebastian City area west of the FEC Railroad, north of Main <br />Street and south of Main Street to Route #512. Pumping <br />Station #3 would discharge via a 14" diameter force main into <br />the 20" force main to be constructed along the eastern <br />right-of-way line of the FEC Railroad. <br />Pumping Station #5 is located along Route 512 in the <br />vicinity of the proposed Chesser Gap development project. It <br />is anticipated that Pumping Station #5 will serve an area of <br />approximately 80 acres and discharge via a 6" force main <br />along the south side of Route 512 and eastward in the alley <br />way parallel to and south of Route 512. This will allow the <br />various existing and future commercial development along that <br />portion of 512 to discharge their sewage into the proposed <br />force mains by means of grinder pumps and eliminate the <br />present and future use of septic tanks in this area. The <br />proposed force main is increased from 6" to 8" in the <br />vicinity of the existing school pump station to provide for <br />the connection of the school system into the project and the <br />elimination of the schools existing package treatment plant. <br />The 8" force main then continues eastward along the alley way <br />and 512 and connects to the 20" force main to be constructed <br />- along the eastern right-of-way line of the FEC Railroad. <br />-19- <br />