My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-142
CBCC
>
Resolutions
>
1980'S
>
1987
>
1987-142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2022 9:37:07 AM
Creation date
9/1/2022 9:46:04 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1987-142
Approved Date
12/01/1987
Subject
Approving a Capital Project to the Sanitary Sewage Collection
transmission, treatment & disposal system facilities
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The existing River Run pumping station will be <br />retro -fitted to serve a sub -area of approximately 72 acres <br />and discharge via a 6" diameter force main south along the <br />east side of U.S. Highway #1 and connect to the existing 6" <br />force main which serves the Reflections project and presently <br />crosses U.S. Highway #1. The Reflections pump station will <br />serve a sub -area of approximately 43 acres and be <br />retro -fitted to meet a design capacity as required to be <br />integrated into the proposed sewer project. The sewage from <br />both River Run pumping station and Relections pumping station <br />will discharge into the 20" diameter force main along the <br />west side of U.S. #1. Thus, the River Run pumping station <br />will allow a phase out of the existing River Run sewage <br />package plant. <br />The 20" diameter force main is increased to a 24" <br />diameter force main at the point of connection of the <br />existing Reflections pumping station/River Run pumping <br />station 6" force main at the west side of U.S. #1. The 24" <br />force main then continues south along the west side of U.S. <br />#1. The 24" diameter force main is sized to provide capacity <br />for the connection of the Whispering Palms Mobile Home Park <br />into the system and this would allow the existing Whispering <br />Palms package plant and the Whispering Palms Too package <br />plant to be abandoned. <br />-20- <br />
The URL can be used to link to this page
Your browser does not support the video tag.