My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-132A
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 12:03:35 PM
Creation date
9/13/2022 11:36:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2022
Control Number
2022-132A
Agenda Item Number
12.G.1.
Entity Name
C.W. Roberts Contracting, Inc
Subject
Indian River Blvd Resurfacing from 53rd Street to the Merrill Barber Bridge
FDOT FM 441919-1-54-01
Project Number
IRC-1707
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
372
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 1— General Requirements, IRC -1707 <br />SECTION 01630 - SUBSTITUTIONS <br />1.1 GENERAL <br />A. Requests for review of a substitution shall conform to the requirements of Article 6.05, <br />"Substitutes and Or -Equals," of the General Conditions, and shall contain complete data <br />substantiating compliance of the proposed substitution with the Contract Documents. <br />1.2 CONTRACTOR'S OPTIONS <br />A. For materials or equipment (hereinafter products) specified only by reference standard, <br />select product meeting that standard by any manufacturer, fabricator, supplier or <br />distributor (hereinafter manufacturer). To the maximum extent possible, provide <br />products of the same generic kind from a single source. <br />B. For products specified by naming several products or manufacturers, select any one of <br />the products or manufacturers named which complies with Specifications. <br />C. For products specified by naming one or more products or manufacturers and stating "or <br />equivalent," submit a request for a substitution for any product or manufacturer which <br />is not specifically named. <br />D. For products specified by naming only one product or manufacturer and followed by <br />words indicating that no substitution is permitted, there is no option and no substitution <br />will be allowed. <br />E. Where more than one choice is available as a CONTRACTOR's option, select product <br />which is compatible with other products already selected or specified. <br />1.3 SUBSTITUTIONS <br />A. During a period of 15 days after date of commencement of Contract Time, ENGINEER will <br />consider written requests from CONTRACTOR for substitution of products or manufac- <br />turers, and construction methods (if specified). <br />1. After end of specified period, requests will be considered only in case of <br />unavailability of product or other conditions beyond control of CONTRACTOR. <br />B. Submit 5 copies of Request for Substitution. Submit a separate request for each <br />substitution. In addition to requirements set forth in Article 6.05 of General Conditions, <br />include in the request the following: <br />1. For products or manufacturers: <br />a. Product identification, including manufacturer's name and address. <br />b. Manufacturer's literature with product description, performance and test <br />data, and reference standards. <br />C. Samples, if appropriate. <br />Substitutions - 01630-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1707 Indian River Blvd Merrill Barber Bridge to 53rd St Resurfacing (SCOP)\1-Admin\Bid Documents\Bid <br />Documents\DIV 1—GENERAL REQUIREMENTS - IRC-1707.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.