Laserfiche WebLink
BK: 3615 PG: 1117 <br />Eighth Draft Clean Version <br />11/07/2022 <br />-3- <br />iii. Phase 2 shall be preparing Preliminary and Final Construction Plans, Technical <br />Specifications, and refined cost estimates for the New Improvements and <br />obtaining permits needed to construct the New Improvements. <br />iv. Phase 3 shall be overseeing the construction of the New Improvements. <br />v. The Non -Trustees Parties agree that each of the Non -Trustee Parties will <br />review the building plans and St. Lucie County ("St. Lucie") will oversee the <br />site permitting and construction of the New Improvements, including <br />Inspections, following the State of Florida building Code as provided herein. <br />vi. St. Lucie, for the benefit of the Non -Trustees Parties, shall competitively <br />procure an architect reasonably satisfactory to the Non -Trustees Parties (the <br />"Architect") In accordance with Florida Law and St. Lucie's Procurement <br />Policy. The Architect shall be responsible for, Inter olia, (1) developing a <br />Space Needs Analysis for the New Improvements (Phase 1); (2) developing <br />Preliminary Construction plans and Technical Specifications for the New <br />Improvements; (3) preparing Final Construction Plans, Technical <br />Specifications, and Bid Documents; (4) obtaining all permits, other than <br />building permits, needed to construct the New Improvements (items (2) <br />through (4) collectively referred to as Phase 2); (5) assisting the Counties in <br />evaluating the qualifications of potential bidders; (6) providing construction <br />and contract administration; and (7) performing construction Inspections as <br />needed to provide certified as -built drawings after the New Improvements <br />are constructed (items (5) through (7) collectively referred to as Phase 3). <br />The Non -Trustees Parties shall participate In the procurement process for the <br />selection of the Architect. The Architects' proposals will be reviewed by a <br />five -member selection committee with one member appointed by the each <br />of the Non -Trustees Parties ("Selection Committee"). The Selection <br />Committee shall select and rank at least three (3) Architects from the <br />proposals submitted. <br />vii. Upon selection of the Architect, the Non -Trustees Parties agree that St. Lucie <br />shall be the contracting agency and shall be responsible for administration of <br />the Contract with the Architect. St. Lucie shall execute a contract with the <br />selected Architect (the "Architect's Contract") with terms as required by <br />Section 287.055 (5) and (6) Fla. Stat. The Non -Trustees Parties shall be named <br />as third -party beneficiaries in the Architect's Contract. Without limiting the <br />foregoing, the Architect's Contract shall require the Architect to procure <br />policies of insurance that relate to the Architect's Work, with terms, limits, <br />coverages, and specifications as required by St. Lucie, and the Non -Trustees <br />Parties shall be designated as named insureds on all applicable policies. St. <br />Lucie, through its Board of County Commissioners, shall have final approval <br />