Subject
Cherrywood Estates Water Expansion Project# 98-05-DS
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />Article 3. CONTRACT TIME. <br />3.1 The <br />work will be completed in accordance, with the <br />following <br />time frame. <br />(a) <br />Within 14 calendar days from effective date of <br />Notice to Proceed, CONTRACTOR shall complete the <br />following tasks: <br />1. Obtain all necessary permits. <br />2. Receive approved shop drawings for all <br />materials and equipment to be utilized in the <br />job. <br />3. Perform all photographic recording and <br />documentation of conditions prior to <br />construction. <br />4. Locate all existing utilities in the area of <br />work. <br />5. Mobilize all labor, equipment, and materials. <br />6. Deliver and store all equipment and materials <br />to the job site. <br />7. Notify all utilities and other affected <br />parties prior to initiating construction. <br />(b) <br />From 15 calendar days to 35 calendar days from the <br />effective date of Notice to Proceed, the CONTRACTOR <br />shall complete the following tasks: <br />1 <br />L <br />1. Install all pipe and appurtenant items. <br />2. Perform all testing. <br />3. Restore all disturbed areas to their <br />preconstruction condition. <br />4. Correct all deficiencies noted by ENGINEER. <br />Completion of all tasks outlined above (i.e., Subparagraphs a <br />and b) constitute Substantial Completion. <br />c) From 36 calendar days to 45 calendar days from the <br />effective date of Notice to Proceed, the CONTRACTOR <br />shall complete the following tasks: <br />1. Clean up project area. <br />2. Remove all equipment andmaterial from project <br />site. <br />3. Perform contract close-out procedures. <br />Completion of all tasks outlined above (i.e., Subparagraphs a, <br />b, and c) constitutes final completion. <br />FA -2 <br />