Laserfiche WebLink
eooK 98 wE389 <br />Department of <br />r Environmental Protection <br />Marjory Stoneman Douglas Building <br />Lawton Chiles 3900 Commonwealth Boulevard Virginia B. Wetherell <br />Governor Tallahassee. Florida 32399.3000 Secretary <br />June 11, 1996 <br />James W. Davis, P.E., Public Works Director <br />Indian River County Board of County Commissioners <br />1840 25th Street <br />Vero Beach, Florida 32960 <br />Dear Mr. Davis: <br />Wetland Resource Permit Number: 31-2428049 <br />Coastal Construction Permit Number: DBS9A0342 IR <br />Project Name: Vero Beach PEP Reef <br />Please be advised that the above referenced wetland resource permit has been transferred to <br />the Bureau of Beaches and Coastal Systems. 1 will be the Department staff contact for <br />administration of both the coastal construction and wetland resource permits. The previous <br />staff contacts, Paden Woodruff and Eric Bush, will be available to assist the Bureau staff. <br />The compliance with the following conditions of Werland Resource Permit 31-2428049 is <br />required prior to commencement of construction: <br />Specific Condition 13: Please submit the signed long-term agreement to the Bureau of <br />Beaches and Coastal Systems. As suggested in ,your letter dated February 26, 1996, the long- <br />term agreement may be revised after the PEP Reef is installed and the first stage post - <br />construction monitoring survey is complete. The modification would provide a time limit on <br />the requirements of Specific Conditions 9, 10, and 11, after the successful completion of the <br />test plan. <br />The compliance with the following conditions of Coastal Construction Permit DBS9A0342 is <br />required prior to the Department's issuance of a written notice to proceed and commencement <br />of construction-. <br />Special Permit Condition 2.1: A baseline pre -installation survey as required in the test plan. <br />Special Permit Condition 2.4: Correct the numerical model, incorporating the correct <br />bathymetry; provide plots showing the average water level landward of the reef with and <br />without the reef, and provide an assessment of the erosion and deposition trends. It is my <br />understanding that this work has been completed and was presented during the administrative <br />hearing. Please submit copies of the design report and all supporting documents. <br />Special Permit Condition 4: Prior to camrnencement of construction activity authorized by <br />this permit, a preconstruction conference shall be held among the contractors, the permittee <br />or authorized agent, the marine turtle permit holder and the Department staff to establish an <br />understanding among the parties as to the items specified in the special and standard <br />conditions of the permit. I have received an announcement of a prefabrication meeting to be <br />held lune 19, 1996, in the county offices and will be attending the meeting. <br />Finally, it is ray understanding that you have been in communication with Michael Sole, <br />Environmental Administrator, Division of Marine Resources, to finalize the marine turtle <br />monitoring requirements in association with the test plan. <br />If I may be of any further assistance, please contact me at the letterhead address (add M&U <br />Smthm 310) or by telephone at 904/487-4475. <br />Sincerely, <br />Robert M. Brandy, Jr.. P. <br />Bureau of Beaches and Coastal Systems <br />25 <br />JUNE 189 1996 <br />