My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-193
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 1:24:47 PM
Creation date
10/9/2023 1:21:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/12/2023
Control Number
2023-193
Agenda Item Number
8.K.
Entity Name
Precision Contracting Services, Inc.
Subject
Agreement for Annual Fiber Optic Engineering, Design Material, Supplies, and Installation
Area
Various throughout Indian River County
Bid Number
2023056
Document Relationships
2023-194
(Cover Page)
Path:
\Official Documents\2020's\2023
2023-195
(Cover Page)
Path:
\Official Documents\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) In the event of an Emergency Trouble Service situation, a trained and qualified <br />technician shall be on-site within three (3) hours of request and notice of emergency <br />PO number. Once a return to service plan is agreed upon, the items needed for the <br />repair as described in Section 4.2.5.b. shall be on-site within two (2) hours. <br />b) The Contractor shall have fusion splicer, OTDR, 5,000 feet of 96 and 48 strand single - <br />mode fiber, and 2,000 feet of 24 strand, multi -mode fiber cable in inventory for <br />deployment to emergency repair. <br />4.2.6 Time and Material Service (BAU): Response to BAU requests shall be within five (5) <br />workdays of the requested service. <br />4.2.7 Should any condition exist that would preclude or inhibit the Contractor's ability to satisfy <br />the maintenance or order work activity within the above specified time frames, the <br />Contractor shall notify IS&T immediately. Additionally, a description of the limiting or <br />exempting condition(s) shall be provided to IS&T with a revised completion date of the <br />required work activity. Furthermore, if such constraining conditions are temporary in <br />nature, the Contractor shall indicate when and/or under what conditions he would again <br />become fully compliant with required response times. <br />4.2.8 The County's normal working hours shall be defined as Monday through Friday, 8:00 a.m. <br />to 5:00 p.m., excluding County holidays. <br />5.0 Commencement of Work Notification <br />5.1 IS&T shall call the Contractor's service center, to report troubles and request all repair and <br />maintenance service. IS&T shall provide the location and all pertinent information related to the <br />trouble report, including the IS&T, (internal) trouble identification number. <br />5.2 IS&T shall contact the Contractor's service center via fax/e-mail, to request T&M service activity. The <br />fax/e-mail transmittal shall contain all information necessary for scheduling and responding to the <br />request, including location where work is to be performed, IS&T (internal) work request number, <br />requesting IS&T contact person's name and telephone number, on-site (work location) contact name <br />& telephone number, description of work activity to be performed, and/or listing of material to be <br />procured and/or installed. <br />5.3 The Contractor shall provide to IS&T, a detailed status report on all open projects on a weekly basis. <br />The report shall be delivered via email to the project contact for IS&T. <br />5.4 The Contractor shall meet (and/or discuss project activity/requirements) with IS&T representative <br />prior to the commencement of any project. Furthermore, the Contractor's project manager shall <br />keep IS&T representative advised of work progress from commencement through completion. <br />5.5 Upon request, the Contractor shall provide a complete itemized estimate, including scope of work, <br />parts, professional services, etc., per project. These per project, estimates shall be approved in <br />writing, by IS&T authorized personnel, prior to commencement of any project. Additionally, there <br />may be instances where IS&T will request a "not -to -exceed" cost for material and labor on a specific <br />project. The Contractor shall be required to provide the "not -to -exceed" cost then, if directed to by <br />IS&T, to complete the specific project for no more than the "not -to -exceed" dollar amount submitted <br />prior to work commencement. <br />5.6 For installed products, "Operational Date" is the date all station lines, network backbones, and <br />campus network (when applicable) are fully operational and ready for use. <br />6.0 INVOICING AND BILLING REQUIREMENTS <br />6.1 Contractor shall submit original invoices electronically, with all necessary backup, to IS&T Division. <br />IS&T will utilize the duplicate invoice copy to validate the billing invoice and effect the correct <br />payment amount through the Comptroller Division. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.