My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-193
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 1:24:47 PM
Creation date
10/9/2023 1:21:41 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/12/2023
Control Number
2023-193
Agenda Item Number
8.K.
Entity Name
Precision Contracting Services, Inc.
Subject
Agreement for Annual Fiber Optic Engineering, Design Material, Supplies, and Installation
Area
Various throughout Indian River County
Bid Number
2023056
Document Relationships
2023-194
(Cover Page)
Path:
\Official Documents\2020's\2023
2023-195
(Cover Page)
Path:
\Official Documents\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.2 All billing invoices submitted to the Owner shall contain the following documentation and <br />information: <br />a. Location (Owner's work center and complete address) where work was performed <br />b. Owner -issued Purchase Order (PO) number <br />c. Name of the IS&T Division representative generating the service request <br />d. Contractor's trouble ticket number or T&M work sheet identification number <br />e. Description of T&M work activity actually performed or a description of trouble clearance. A List of <br />all material used to complete the work request or trouble AND a copy of receipt(s) from <br />Contractor's supply source depicting actual cost of material provided to complete the work <br />request. <br />f. Job start date, end date and time <br />g. Test results completed after installation as specified in Specifications, Section 7.2.5 <br />h. The IS&T Division is required to validate the accuracy of all billing invoices before payment <br />authorization can be made; therefore, billing invoices received which do not contain the required <br />information will result in a delay in payment. Invoices which cannot be validated by the Owner <br />shall not be paid. <br />7.0 PROJECT SPECIFICATION - TECHNICAL <br />7.1 This "overall" project, with its individual work requests, shall consist of, but is not limited to, the <br />procurement, delivery, installation and testing, of fiber optic cables, fiber optic cable terminations <br />and terminating equipment and hardware, etc. <br />7.2 TESTING REQUIREMENTS <br />7.2.1 The Contractor shall be required to perform tests on all fiber installed, to ensure <br />operational and technical conformity. Dispersion, splice loss, and optical time domain tests <br />shall be performed on all fiber optic cable installed. <br />7.2.2 Dispersion, splice loss, and optical time domain tests, shall be performed on all fiber optic <br />cable installed. <br />7.2.3 Each reel of fiber optic cable provided by the Contractor shall be accompanied by the <br />manufacturer's test data showing the conformance to the requirements described herein. <br />The manufacturer's test data shall identify each fiber in each cable and list its factory <br />tested attenuation in decibels per kilometer. This attenuation shall meet as a minimum, <br />the attenuation requirements set forth in Table — Fiber Optic Cable Specifications (Section <br />7.5.2) included in this document. <br />Ensure that each finished and installed fiber optic cable segment shall be traceable to the <br />test date on file for each step in its manufacturing process. The Contractor shall provide <br />the County five (5) calendar days advance notice of the date the cable will be ready for <br />final testing so that County staff may be present at the tests if staff elects. <br />7.2.4 The Contractor shall test the fiber optic cable at the site storage area prior to installation. <br />Test each optical fiber in the cable from one end and one wavelength with an OTDR <br />compatible with wavelength and fiber type. Check for continuity, kinks, anomalies, and <br />appropriate attenuation. Record each measurement with color, location and type of fiber <br />measured. If the tested loss per kilometer exceeds the loss from the manufacturers test <br />data, the County will reject the cable. An electronic and hard copy shall be provided to <br />IS&T prior to the fiber optic cable being installed. <br />7.2.5 After installation (splicing and termination) is complete, and if specified, the Contractor <br />shall test the optical fiber in the cable again for the loss characteristics. Perform a uni- <br />directional test on all terminated fibers using the Optical Time Domain Reflectometer <br />(OTDR). Single mode fiber that is a distance of five (5) miles or less shall be shot at a <br />1310nm wavelength. Single mode fiber that is greater than five (5) miles shall be shot at a <br />1550nm wavelength. Multi -mode fiber shall be tested at an 850nm wave length. Results <br />of these tests shall be provided to IS&T in both a hard copy and electronic format for <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.