My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-195
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 1:44:52 PM
Creation date
10/9/2023 1:41:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/12/2023
Control Number
2023-195
Agenda Item Number
8.K.
Entity Name
Gerelcom, Inc.
Subject
Agreement for Annual Fiber Optic Engineering, Design Material, Supplies, and Installation
Area
Various throughout Indian River County
Bid Number
2023056
Document Relationships
2023-193
(Agenda)
Path:
\Official Documents\2020's\2023
2023-194
(Agenda)
Path:
\Official Documents\2020's\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
compensation is lump sum maximum amount not to exceed task based, or any combination of the foregoing; a <br />budget establishing the amount of compensation to be paid with sufficient detail so as to identify all of the various <br />elements of costs; and any other additional instructions or provisions relating to the specific Services authorized <br />pursuant to each Purchase Order that does not conflict with the terms of this Agreement. <br />4.04 Services related to any individual Work Authorization which would increase, decrease or which are <br />otherwise outside the scope of Services or level of effort contemplated by a Work Authorization shall be Services for <br />which the Contractor must obtain the prior written approval of the Owner as provided by this Agreement. All terms <br />for the performance of such Services must be agreed upon in a written amendment to the Work Authorization, <br />executed by both the Contractor and the Owner. <br />4.05 A Work Authorization shall not give rise to any contractual rights until it meets the foregoing requirements. <br />Each specific Work Authorization, as approved by the Owner, shall be an addendum to this Agreement. Nothing <br />contained in any Work Authorization shall conflict with the terms of this Agreement, and the terms of this Agreement <br />shall be deemed to be incorporated in each individual Work Authorization as if fully set forth therein. <br />ARTICLE 5 - PAYMENT PROCEDURES <br />5.01 Invoices <br />Contractor shall submit original invoices electronically, with all necessary backup, to the Information Services & <br />Telecommunications (IS&T) Division. The IS&T Division will utilize the duplicate invoice copy to validate the billing <br />invoice and effect the correct payment amount through the Finance Department. <br />All billing invoices submitted to the County shall contain the following documentation and information: <br />a. Location (County work center and complete address) where work was performed <br />b. Owner -issued Purchase Order (PO) number <br />c. Name of the IS&T Division representative generating the service request <br />d. Contractor's trouble ticket number or T&M work sheet identification number <br />e. Description of T&M work activity actually performed or a description of trouble clearance. A List of <br />all material used to complete the work request ortrouble AND a copy of receipt(s) from Contractor's <br />supply source depicting actual cost of material provided to complete the work request. <br />f. Job start date, end date and time <br />g. Test results completed after installation as specified in Specifications, Section 7.2.5 <br />h. The IS&T Division is required to validate the accuracy of all billing invoices before payment <br />authorization can be made; therefore, billing invoices received which do not contain the required <br />information will result in a delay in payment. Invoices which cannot be validated by the Owner shall <br />not be paid. <br />5.02 Method of Payment <br />Owner shall make only one payment for the entire amount of each work order, when the work has been completed. <br />Upon a determination of satisfactory completion, the Owner's Project Manager will authorize payment to be made. <br />All payments for services shall be made to the Contractor by the Owner in accordance with the Local Government <br />Prompt Payment Act, as may be amended from time to time (Section 218.70, Florida Statutes, et seq.). <br />5.03 Acceptance of Final Payment as Release <br />0A <br />
The URL can be used to link to this page
Your browser does not support the video tag.