Laserfiche WebLink
Install a master hub cabinet that provides an environmentally cooled enclosure facility required for the <br />sensitive network equipment to be furnished on this project. The cabinets ha I I be designed for the explicit <br />use of housing sensitive electronic equipment (e.g., gigabit ethernet switches, 10/100 ethernet switches, <br />media converters, port/terminal servers, fiber optics equipment, and other related components, etc.) <br />within a controlled atmosphere required for the proper operating conditions for installed equipment and <br />shall be furnished by the system manager. <br />The master hub cabinet shall meet or exceed the following minimum requirements: <br />a) Size: Dimensions shall be approximately 104"H x 108"W x 77"D; <br />b) AC Unit/Cooling Unit: The cabinet shall have an AC unit/cooling unit(s) with a minimum <br />total cooling capacity of 20,000 BTUs. The AC unit/cooling unit(s) shall be designed <br />specifically for outdoor electronic enclosures and shall be designed for a fully-gasketed, <br />leak -proof installation in accordance with the NEMA 4/4X enclosure rating. Refrigerant <br />shall be CFC -free; <br />c) Lighting: The cabinet shall include a switch controlled fluorescent light fixture providing <br />adequate work lighting throughout the cabinet; <br />d) Electrical Outlets: Two (2) separate duplex (GFCI) wall electrical outlets for <br />test/maintenance equipment shall be provided. Two (2) separate standard duplex <br />outlets shall be supplied for equipment power; <br />e) Equipment Racks: Two (2) 19" EIA equipment racks with two (2) vertical and four (4) <br />horizontal cable management panels per rack, placed as specified within the plan set; <br />f) Ladder Racks: Ladder rack cable management system as depicted within the plan set <br />shall be provided; <br />g) Power Distribution: The cabinet shall provide for power distribution to all installed <br />equipment racks, lighting and the air conditioning unit shall be provided; <br />h) Lightning Protection System: Provide for lightning protection for the overall, integrated <br />structure, including each metallic (copper) conductor penetrating the cabinet; <br />i) Common Grounding System: A cabinet grounding system shall be provided; <br />j) Cabinet Monitoring System: A cabinet monitoring system shall be provided to <br />continuously monitor and report local conditions (temperature, humidity, smoke, and <br />door alarm). <br />7.9.10 Construction <br />Construct a flat, level, concrete base, meeting the requirements for Class 1, non-stressed concrete and <br />shall be accepted according to Section 347 of the FDOT Standard Specifications, and the latest <br />supplements. The minimum final grade shall be set at nominal 8" above the surrounding grade to ensure <br />that water drains away from the cabinet. Restore surrounding surfaces to their original condition. <br />7.9.11 Method of Measurement <br />The Detector Cabinet Type II, Detector Cabinet III, and Detector Cabinet VI shall be measured for <br />payment at each site as installed. Detector Cabinet IV and its corresponding base (A268-4.1) shall be paid <br />as each is installed. The Detector cabinet base installed shall be an appurtenance of the Type IV Detector <br />Cabinet. The unit price for each master hub cabinet installed shall include all labor, equipment, <br />foundations, mounting hardware, and miscellaneous material necessary for a complete and acceptable <br />installation. The engineer's system manager will supply the cabinet assemblies as specified in the <br />contract. <br />7.9.12 List of Items for Outside Plant Cabinets <br />Communications Cabinet — 35"H x 24"W x 22"D, with concrete base <br />Communications Cabinet — 51.25"H x 20"W x 18"D, with concrete base <br />40 <br />