My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />proposed building foundations or paving subgrade, the areas within road rights - <br />of -ways, under parking areas, and the areas under and within five feet of <br />proposed buildings shall be precompacted. This precompaction shall be <br />performed equally on existing ground and on surfaces which have been <br />excavated to remove unsuitable material. The top one foot of said areas shall <br />be compacted to a minimum density of 95% of maximum as determined by <br />AASHTO T-180. The maximum spacing between density tests shall be 150 <br />t . feet. <br />7. COMPACTION <br />A. Backfill material shall be compacted to 95% of maximum density per <br />AASHTO T-180. Equipment suitable and adequate for uniform compaction <br />to the specified density shall be used for backfill operations subject to the <br />approval of the Engineer. All compaction equipment shall be in good working <br />order and any worn or defective equipment shall be immediately replaced or <br />repaired. <br />8. SOIL STABILITYAND COMPACTION CONTROL <br />A. The Contractor shall arrange to have sufficient soil tests made by an <br />independent testing laboratory selected by the Engineer to demonstrate <br />conformance or his worts with the stability and compaction levels required by <br />l.o.... 4:.......... C till be en 0. spea.ti n.neivua. ompaiiivri tests Suau ve t8n.0 as rntervaa eaaa.0 in..tu <br />t or as deemed necessary by the Engineer. <br />B. Any proposed alternative test methods to those specified herein must be <br />i approved by the Engineer prior to testing. At the request of the Engineer, the <br />Contractor shall provide such documentation of a proposed alternative test <br />method as the Engineer may require to evaluate the method for approval. <br />C. In no case shall the Contractor proceed with construction on compacted <br />material until the tests prove satisfactory and approval is given by the <br />Engineer. <br />i_ <br />D. In general, at least one test for maximum dry density/optimum moisture <br />content shall be performed on a representative sample of each inherently <br />different material to be used for compacted backfill or embankment fill. For <br />material of uniform composition and textural class, a minimum of one test per <br />200 cu. yd. of material shall be performed at the point of use. <br />E. Tests for in-place density (percent compaction) shall be taken at locations <br />designated by the Engineer. <br />02203-2
The URL can be used to link to this page
Your browser does not support the video tag.