My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177 A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177 A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2023 1:44:09 PM
Creation date
11/13/2023 1:42:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177A
Entity Name
Summit Construction Management, Inc.
Subject
Dale Wimbrow Park Improvements
Project Number
9625B
Bid Number
9061
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />0 <br />f <br />SECTION 02204 <br />GRASSING BY SODDING <br />j 1. SCOPE <br />1 A. The Contractor shall furnish all materials, labor,equipment and supervision <br />required to prepare the soil, fine grade Ute area and establish a Healthy stand <br />of grass by sodding of the areas so designated oil the drawings and as specified <br />herein. <br />r <br />2. GENERAL <br />A. PREPARATION <br />t 1) The area to be sodded shall be clear of old sod and weeds. The area <br />shall be fine graded and the surface looseaied, by scarifying, if <br />necessary. If the soil is dry it shall be moistened to provide an <br />I , optimum growing condition. <br />i 13. FERTILIZER <br />1) Fertilizer shall be uniformly spread over the area to be sodded at the <br />rate of 400 to 500 pounds per acre. The fertilizer shall have a chemical <br />designation of 12- 8-8. Soil which has a PH of 5.0 or lower shall, If <br />directed by tite Engineer, have an application of dolomite lime stone, <br />but the amount of dolomite applied shall not raise the PII above G.O. <br />C. SOD <br />1) The sod shall be l5c%kioa unless otherwise noted or directed by <br />the Engineer. 'Flee sod shall be of a tough texture with a good ivat of <br />routs. It shall be free of weeds and other objectionable grasses. Ap- <br />proximately three days prior to cutting Utz sod, it shall be closelymowedandrakedtoremoveexcessgrowthanddebris. The sod shall <br />be cut with sufficient thickness to retain the root system intact. There <br />shall be a mininium of delay between (lie cutting of the sod and the <br />laying so that it is live, fresh and uninjured when laid. <br />1). LAYING <br />1) No sod shall be laid until the Engineer has approved the condition of <br />the prepared area. The sod shall be placed with the edges in close <br />contact. Where the sod is laid on a slope the pieces of sod shall be <br />lotig the joitils aitt! laid with staggered juinis to lutidinize %rosi0ii 1. <br />where the sod is laid in drainage swales and flitches the joints shall be <br />staggered in the line of flow for the same reason. After the sell is laid 4 <br />shall be brought into close contact Willi (lie soil by tamping, light rolling <br />or other acceptable means. Where the sod may slide due to the steep <br />slope it shall be pegged to firm soil with wood pegs. <br />022u4-1
The URL can be used to link to this page
Your browser does not support the video tag.