Laserfiche WebLink
TASK 2 — PROGRAMMING AND INTEGRATION — NO CHANGES <br />TIME SCHEDULE <br />Consultant's original proposal anticipated construction duration of twenty-four (24) months will be <br />required. This amendment is provided to account for initial contractor NTP of August 4, 2021 and <br />a revised final completion date of May 17, 2024. The updated construction duration is thirty-four <br />(34) months. <br />FEESCHEDULE <br />We will provide these services in accordance with our Agreement for Professional Services for <br />Water Plant and Water Resources Engineering Services — RFQ 2019070, dated November 5, 2019, <br />by and between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services on a lump sum fee basis as follows: <br />Task <br />No. <br />Task <br />WO #6 <br />(Previously <br />Authorized) <br />Amendment 1 <br />Revised <br />Total <br />Task 1 <br />Construction Phase Services <br />$865,774 <br />$263,132 <br />$1,128,906 <br />Task 2 <br />Programming and Integration <br />$356,772 <br />$0 <br />$356,772 <br />Total Lump Sum Fee <br />$1,222,546 <br />$263,132 <br />$1,485,678 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project but may be <br />required depending on circumstances that may arise during the execution of this project. <br />Additional services include, but may not be limited to the following: <br />• Construction phase services beyond what is described herein <br />• Re -design or integration beyond what is described herein <br />K. IWPB_CivillGenerallBlacklFloridaL'RCUlOslo WTP Construction Phase IAmendmenh20231023 -Amendment Oslo CPS.doc Page 4 of 6 <br />Indian River County Utilities Department <br />