Laserfiche WebLink
FUCK 98 pAu618 <br />the proposed lake, and such zones have been depicted on the <br />plan. The littoral zone planting plan will need to be <br />approved prior to the issuance of a land development permit. <br />10. Concurrency Management: Long-range planning staff has <br />indicated that a conditional concurrency certificate will be <br />issued for this project prior to the Planning and Zoning <br />Commission's consideration of this item. Thus, all <br />concurrency requirements related to preliminary PD approval <br />have been satisfied. <br />11. Stormwater Management: As with standard single family <br />subdivisions, the stormwater management plan has been <br />conceptually approved by the public works department, provided <br />that the applicant can document a legal positive outfall. <br />Final review and approval of. the stormwater management plan <br />shall be accomplished through the land development permit <br />process. <br />12. Thoroughfare Plan: The project has 647' of frontage on CR 510 <br />which is designated on the Thoroughfare Plan as an urban <br />principal arterial requiring 160' of right-of-way. Presently <br />the existing right-of-way width varies between 120' and 1401. <br />The applicant's design accommodates the additional 20' and 40' <br />segments that will be acquired by the county. The county will <br />acquire the full right-of-way for CR 510 as part of this <br />project and compensate the applicant through traffic impact <br />fees and other means. <br />13. Traffic Circulation: The project will be accessed from CR 510 <br />by the subdivision's main roadway which will provide access to <br />the other streets within the subdivision. The connection to <br />CR 510 will be the only vehicular access point for this <br />subdivision. Staff reviewed the alternative of <br />interconnecting the proposed PD with one or more streets in <br />Oceanaire Heights, and decided not to recommend such vehicular <br />interconnections. This decision was based upon the <br />limitations of the existing street pattern to the east of the <br />subject property and potential negative impacts on Oceanaire <br />Heights. Since Coco Plum is the only through street to SR A- <br />1 -A, Coco Plum would bear the majority of any traffic as a <br />result of an interconnection with the PD. In staff's opinion, <br />the traffic funnelling effect on Coco Plum would adversely <br />affect the existing homes on that street. <br />As a result of the Traffic Impact Analysis, which was reviewed <br />and approved by the County Traffic Engineering Division, a <br />left -turn lane on CR 510 is required at the project entrance. <br />The left -turn will need to be constructed prior to the <br />issuance of a certificate of completion for phase II. Also, <br />the developer will provide a west bound right -turn lane on CR <br />510, an improvement which is not a requirement of the Traffic <br />Impact Analysis. <br />The applicant will provide an emergency access interconnection <br />at Coco. Plum Lane, for which the construction details will <br />need to be approved by the Emergency Management Department <br />prior to the issuance of a land development permit. There <br />will also be a pedestrian interconnection between the proposed <br />development and Oceanaire Heights at the emergency access <br />point (Coco Plum Lane). Such an interconnection should <br />benefit residents of both the proposed PD and Oceanaire <br />Heights neighborhoods. <br />42 <br />JULY 239 1996 <br />