40 <br />Contract #SD609AA <br />the Oak Lake Area. Excavation, cleaning and widening of Canal B and the excavation of a new <br />canal at 80`h Street will connect to the Lake 20 Area. <br />Expected Results: Both Canal A and Canal B will receive reshaping and 3,200 linear feet of <br />cleaning. Excavation of tate 80h Street Canal near the Oak Lake Area will be constructed as a <br />2,000 linear feet facility with two canal crossing structures (pipe structures with cltdwalls). <br />Excavation of the 80h Street Canal near the lake 20 Area will be constructed as a 2,000 linear <br />feet facility with two canal crossing structures. <br />Esti to gas : Cleaning and reshaping for Causal A is estimated to cost $12,800.00. Cleaning <br />and reshaping for Canal B is estimated to cost $12.800.00. Excavation and carnal crossings for <br />the 861h Street canal is estimated to cost $117.000.W. Excavation and canal crossings for 80h <br />Street canal is estimated to cost $127,000.00. <br />Lsliin_ated Schedule, Start March 2000, finish March 2001 <br />Deliverables: Bi -Monthly Progress Reports on construction status. Completion of construction <br />and reshaping of canals, and construction of canal crossings. <br />Task 8: Implementation of Water Quality Monitoring Program <br />Description: Prior to construction of any stormwatcr treatment ponds or ditch excavation, <br />COUNTY will implement a water quality monitoring program of stormwatcr at the project sites. <br />Future operation of these slormwater detention facilities shall be optimized by reviewing the <br />monitoring results and fine tuning ttte system operation as needed. <br />Expected Results: A regular surface water monitoring program will be implemented at the <br />project site. 'Regular review of results will guide operation of the stormwatcr treatment ponds as <br />needed.. <br />Estimated Cast: The start up, operation and completion shall be completed by a selected <br />environmental firm. Tile monitoring effort has been cstimated to cost $30,000. <br />Estimated ;schedule: Start November 1999, finish March 2002. <br />Deliverables: Base Line. Water Quality Monitoring Plan (December 1999). Monthly water <br />quality reports prior to initiation of construction (lanuary — March 2000). Post -construction <br />Water Quality Monitoring Plan. Bi -monthly waiter quality updates from monitoring events, <br />storm event grab sample reports, and two bi-annual stormwatcr analysis reports summarizing <br />post -construction water quality sampling results. <br />Task 9: Implementation of Education Component <br />Description: A Florida Yards and Neighborhoods (FYN) Educational program will he <br />implemented over a 16 -month time frame to educate the homeowners of Vero Lake Estates. <br />Fxncted Results: FYN workshops and FYN Yard Certification. <br />Estimated Cost: Education for this project has been estimated to Cost $18,450 <br />Page 15 of 28 <br />