My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-313
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 3:20:54 PM
Creation date
1/18/2024 3:20:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
12/07/1999
Control Number
1999-313
Entity Name
Camp Dresse & McKee
Subject
Work Autorization 10 for South County Water Treatment Plant Membrane Process Optimization & System
Improvements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;n!,rn h;Ytl C: <br />Admin. <br />IV. Compensation for Services <br />urlrtl�c <br />Bich M <br />Task 1000 - Engineering Services for Membrane Process <br />Optimization/System Improvements/Hurricane <br />Enhancements — South County WTP $57,750 Upper Limit <br />Compensation for Task 1000 is to be paid on a salary cost basis plus other direct costs on <br />an as -needed basis. (See Attachment B). <br />A. Salary Cost Basis with Upper Limit <br />For the Basic Services performed on a salary cost basis with an upper limit, IRC <br />agrees to pay CDM as follows: <br />For engineering services performed by CDM, the payment will be equal to the <br />salary cost of such services for each employee times 2.3 for overhead and profit <br />plus actual out-of-pocket expense costs. Salary cost is equal to 1.393 times direct <br />salary costs and is defined as the cost of salaries (including sick leave, vacation, and <br />holiday pay applicable thereto) for time directly chargeable to the project; plus <br />unemployment, excise, and payroll taxes; and contributions for social security, <br />employment compensation insurance, retirement benefits, and medical and other <br />group insurance benefits. <br />Actual out-of-pocket expense costs are all costs other than salary costs that are <br />incurred during the progress of the work. The actual out-of-pocket expense costs <br />include: air fare, automobile rental if required, mileage charges, parking tolls, taxi, <br />meals, lodging, telephone, printing and reproduction costs, and other miscellaneous <br />{ costs incurred specifically for this project. The maximum cost for blueprint sheets <br />{ is $1.10. The maximum cost for mylar sheet is $11.00 and a sepia sheet is $5.00. <br />The charges for in-house computer program and word processor usage will be at <br />CDM's regular rates. For outside computer services, charges will be made at <br />invoiced cost to CDM. <br />For the basic services performed on a salary cost basis with an upper limit, IRC agrees to <br />provide a written request before work is started by CDM. <br />SUBMITTED BY: APPROVED BY: <br />CAMP DRESSER & McKEE INC. <br />(Consultant) <br />By�'YI-a-rr�s,/I <br />E. Lawrence Adams, Jr., P.E. D.E.E. <br />Vice President <br />Date_ U <br />INDIAN RIVER COUNTY <br />BOARD O COUNTY COMMISSIONERS <br />By <br />enneth R. acht <br />Chairman <br />Date December 7, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.