My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />• <br />2.. Except as specifically approved in advance by <br />the Engineer, re -use of forma shall in no way <br />r impart less structural stability to the forms <br />nor lass acceptable appoarance to finished <br />exposed concrete. <br />3.04 REMOVAL _ OF CORMS <br />A. General: <br />1. Minimum periods to form removal after concrete <br />placement shall be a follows: <br />Slabs and curbs 24 hours <br />vertical walls (4'--0" Ht.) 36 hours <br />Vertical walls (over 4'-0" Ht.) 7 days <br />2. Removal of formwork may be extended if deemed <br />necessary by the Engineer. <br />B. Removal: <br />1. Remove metal spreader ties on exposed concrete <br />by removing or snapping off inside the ria 11 <br />surface and point up and rubbing the resulting <br />pockets to match the surrounding areas. <br />2. Flush all Boles resulting from the use of <br />spreader rods and sleeve nuts, using water, and <br />then solidly pack throughout the wall thickness <br />with cement grout applied tinder pressure by <br />means of a grouting gun; grout shall be one (1) <br />part portland cement to two and one-half (2-1/2) <br />parts sand; apply grout immediately after <br />removing forms. <br />PART 4 - ITEM OF PAYMENT: <br />No separate Payment shall be made for work <br />specified in this Section; Payment for work <br />specified in this Section shall be included in <br />Payment made for other Sections. <br />***ENO OF SECTION*** <br />07100-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.