My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />r <br />r- <br />2. Bead Provided on side face of doors and secured <br />with oval head countersink screws. <br />E. DOORS WI'T'H LOWERS <br />1. Exterior: Provide 16 gauge electro zinc coated <br />bonderized sheet steel louver frames and <br />weatherproof "Z" type louvers full thickness of <br />door welded into doors. <br />2. Interior: Provide 18 gauge electro zinc <br />coated bonderized sheet steel louver frames and <br />inverted "Y" type louvers full thickness of door, <br />welded into doors. <br />3. Provide special size and shape louvers as shown. <br />4. Louver Door Security,Panels: Woven wire mesh. <br />Furnishanand install on all exterior metal louver <br />doors. <br />F. SCREENS <br />Where louvers are indicated on exterior doors provide <br />18 x 14.0111' alloy number 302,1304 stainless steel <br />wire cloth secured in removable ,015 inch stainless <br />steel alloy number 302/304 roll -formed frames. Mount <br />screens on interior of doors with stainless steel <br />screws. <br />G. FIRE DOOR ASSEMBLIES <br />1. Fire door assemblies. including frames & hardware, <br />shall meet tire test and rating requirements in <br />accordance with the procedure of Underwriters <br />Laboratories or Factory Mutual Laboratries. <br />Provide appropriate labels on doors and frame. <br />2. Fabrication and assembly requirements necessary to <br />obtain labels will take precedence over <br />requirements shown or specified, except where <br />requirements shown or specified exceed the sizes <br />or gauges required for labeling. <br />3. Required ratings are as shown on drawings. <br />H. FINISH HARDWARE COORDINATION <br />Metal doors and frames shall be prepared at the <br />factory for application of finish hardware at the job <br />site. Templates are to be supplied by the finish <br />hardware manufacturer to assure accurate preparation <br />of doors & frames in accordance with the Hardware <br />Schedule. <br />I. SHOP PAINTING <br />1, imperfections spot glazed with metallic filler and <br />sand smooth. <br />0$100-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.