My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />M <br />{' other wise indicated, sample submittals are for the <br />County Engineer's observation of color, texture, <br />pattern and "kind", as applicable. Maintain <br />returned set at project site, for purpose of quality <br />control comparisons. <br />2.02 SUBSTITUTIONS <br />A. Approval Required: <br />1. The Contract is based on the standards of <br />quality established in the Contract Documents. <br />2. All products proposed for use, including those <br />specified by required attributes and perform- <br />ance, shall require approval by the Architect <br />and the Engineer before being incorporated into <br />the work. <br />3. Do not substitute materials, equipment or <br />methods unless such substitution has been <br />specifically approved for this work by the <br />Architect and the Engineer, in writing. <br />B. "Or Equal": <br />1. Where the phrase "or equal" or "or equal as <br />approved by the Architect and Engineer" occurs <br />in the Contract Documents, do not assume that <br />materials, equipment or methods will be approved <br />as equal unless the item has been specifically <br />approved in writing by the Architect and the <br />Engineer. <br />2. The decision of the Engineer shall be final. <br />01300.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.