My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION] 02201 -CLEARING-AND f RURBIN G <br />1.01 SCOPE <br />A. The Contractor shall furnish all labor, materials and equipment, and all opp:ations <br />required to clear and grub the site as shown on the Flans and speciiicd herein. <br />2.01 GENERAL <br />A. Clearing; and grubbing shall consist of the complete removal and disposal of all <br />trees, brush, logs, stumps, roots, weeds, rubbish, rocks, structures designated to be <br />removed, concrete and other deleterious material and obstructions resting upon or <br />protruding through the surface of the ground. Stumps, roots 3" and over and similar <br />obstructions shall be removed to a minimum depth of 2 feet below the existing ground. <br />All structural items shall be excavated to full depth, completely removed, and the <br />excavation backfilled per these specifications, <br />B. The Contractor shall clear and grub the areas described below. <br />1, Area of development, easements, swales, and other areas where <br />construction is to take place only with specific approval of CDmnly <br />Eligince as to the exact areas to be cleared. <br />3.01 DISPOSAL, <br />C i M IMMUNE <br />1. When permitted by local governing authorities, trees, su nips, brush, <br />weeds, and similar natural materials may be burned on site. The Contractor shall dispose <br />of all unburned residue off site, and if required by the Engineer, spread the ash. Material <br />which will not burn or will not burn without air pollution, such as asphalt and tires, shall <br />be hauled off site for disposal in an approved manner. <br />B, OF E SITE DISPOSAL <br />1, When on site burning is not permitted, all material shall be hauled offsite <br />uy the Cuniracior for disposal in an approved manner. <br />C. The Contractor shall be responsible for obtaining and complying with the <br />provisions of all necessary permits. AFI fees shall be paid by the Contractor. <br />D. THIS PROJECT: (Donald MacDonald Park Improvements) No material shall be <br />burned on site. <br />***END OF SECTION*** <br />Gi2oi-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.