My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to lie built or placed therein has been completed as specified. Dewatering shall <br />be done in a manner that will not cause sloughing or caving of the excavation <br />walls. Water from said dewatering shall be disposed of in a manner as will not <br />result in violations of State water quality standards in receiving waters, nor <br />cause injury to public health nor to public or•private property, nor to the work <br />completed or in progress. Any and all damage caused by dewatering sliall be <br />promptly repaired by the Contractor at no cost to the Owner. The receiving <br />point for water from said operation shall be approved by the applicable <br />regulatory agency and flee Engineer. The Contractor is responsible for <br />obtaining all required permits and any other approval necessary. <br />G.. REMOVALOF MUCK, ROCK AND OTHER UNSurrABLC MATERIAL <br />A. All truck, rock , clay, marl, gravel, boulders, heterogeneous fill material and <br />any other organic or unsuitable "materials of excavation" encountered under <br />pavement areas, structures and utilities shall be excavated and removed. Also <br />any "unforeseen obstacles" such as buried trees or timbers, abandoned <br />utilities, metal objects, concrete masses, or any other type of debris <br />encountered shall be removed. <br />B. Stripping shall be accomplished to cleats in-place sand or other suitable <br />material as approved by (lee Engineer. Removal of unsuitable material within <br />areas which are to receive footings, slabs or other foundations shall be <br />completed for dee full area under such structures and to ten feet minimum <br />outside the maximum perimeter. Where pavement is to be placed, said <br />removal shall include all area under the surface and extend to lite outside of <br />shoulders and under sidewalks and bike paths, or as directed by the Engineer. <br />C. All roots, stumps, togs, limbs, timbers, boulders, or any material which is not <br />suitable for backfill material shall be removed from the site promptly and <br />excavated and disposed of by the Contractor at his expense. <br />D. All "materials of excavation" and "unforeseen obstacles" will be considered as <br />incidental to construction and no additional compensation will be allowed. <br />02702-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.