My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-177B
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-177B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:28:22 PM
Creation date
1/19/2024 2:18:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/06/1999
Control Number
1999-177B
Entity Name
Summit Construction Management, Inc.
Subject
Contract for Donal MacDonald Park Improvements
Project Number
9625A
Bid Number
9062
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do <br />• <br />r <br />proposed building foundations or having subgrade, the areas within road rigltts- <br />of-ways, under parking areas, and the areas under and within five feet of <br />proposed buildings shall be precompacted. 'flus precompaction shall be <br />performed equally on existing ground and on surfaces which have been <br />excavated to remove unsuitable material. The top one foot of said areas shall <br />be compacted to a minitnutn density of 95% of maximum as determined by <br />AASI-ITO T-180. The maximum spacing between density tests shall be 150 <br />feet. <br />7. COMPACTION <br />A, Backfill material shall be compacted to 95% of maximum density per <br />AASIITO T-1130. Equipment suitable and adequate for uniform compaction <br />to time specified density shall be used for backfill operations subject to the <br />approval of the Engineer. All compaction equipment sltall be in good working <br />order and any worn or defective equipment shall be immediately replaced or <br />repaired. <br />8. SOIL STABILITYA.ND COMPACTION CONTROL <br />A. The Contractor shall arrange to have sufficient soil tests made by an <br />independent testing laboratory selected by the Engineer to demonstrate <br />conformance of his work with the stability and compaction levels required by <br />these specifications. Compaction tests shall be taken at intervals listed herein <br />or as deemed necessary by the Engineer. <br />B. Any proposed alternative test methods to those specified herein must be <br />approved by the Engineer prior to testing. At the request of the Engineer, the <br />Contractor shall provide such documentation of a proposed alternative test <br />method as Elie Engineer may require to evaluate the method for approval. <br />C. In no case shall the Contractor proceed with construction on compacted <br />"late' -jai until the tests prove satisfactory and approval is given by the <br />Engineer. <br />D. In general, at least one test for maximum dry densityloptimura moisture <br />content shall be perforated on a representative sample of each inherently <br />different material to be used for compacted backfill or embankment fill. For <br />material of uniform composition and textural class, a minimum of one test per <br />200 cu. yd. of material sltall be performed at the point of use. <br />E. Tests for in-place density (percent compaction) shall be taken at locations <br />designated by the Engineer. <br />tl. U-1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.