owners association, and will be subject to the master Declaration of Covenants, as well as, the Windsor <br />Code (private development regulations). Also, all residents/members of the original Windsor PD project <br />will have access to the proposed new fitness center located within the North Village project area. <br />Planning and Zoning Commission (PZC) Recommendation: <br />At its meeting of October 26, 2023, the PZC voted 7-0 to recommend that the BCC approve the PD <br />rezoning and the conceptual PD plan with the conditions recommended by staff, and one additional/revised <br />condition of approval (see next paragraph). The PZC also approved the concurrent preliminary PD <br />plan/plat subject to BCC approval of the PD rezoning and conceptual PD plan. <br />During the PZC public hearing, one adjacent property owner, Mr. Paul Reinecke, requested that the <br />northern 8' tall masonry wall proposed between the Wabasso Estates Subdivision and the project's <br />proposed northern private road connection to Highway AIA be removed from the project. Mr. Reinecke <br />suggested that because the northern private road connection will be a gated, resident -only connection, the <br />vehicular traffic on that road should be minimal, and an 8' tall masonry wall should not be necessary. Mr. <br />Reinecke also requested that the northern driveway not be utilized as a construction entrance for the <br />project, but did acknowledge that there would be some noise and disturbances caused by the actual <br />clearing, grading, and paving of the new road. Based on feedback from Mr. Reinecke and the PZC, staff <br />has updated the staff recommendation to the BCC accordingly (see condition 2e). <br />It should be also noted that several other adjacent or nearby property owners expressed their concerns over <br />different aspects of the project during the PZC public hearing. However, no other substantive changes have <br />been made to the project design or staff's recommendation. <br />BCC Review: <br />The BCC is now to review the application, conduct a public hearing, and make a final decision to approve, <br />approve with conditions, or deny the PD rezoning request and the accompanying conceptual PD plan. <br />Planned Development Rezoning: <br />The overall project site contains ±52.96 (gross) acres, with ±46.90 acres zoned A-1, Agriculture -1 (up to 1 <br />unit/5 acres) and ±6.06 acres zoned RS -3, Residential Single -Family (up to 3 units/acre). Because the <br />developer is proposing a mixture of single-family homes and few multi -family units, the project site must <br />be rezoned to PD, Planned Development. <br />If the subject application is approved, the entire site will be rezoned to PD and will be governed by the <br />approved conceptual PD plan. <br />The PD Zoning District Generally: <br />A number of residential projects have been approved through the PD rezoning process. These include <br />Harmony Reserve, Pointe West, Old Orchid, Woodfield, Waterway Village, and Citrus Springs. Unlike <br />standard zoning districts, PD districts have no prescribed limits regarding lot size or dimensional criteria. <br />Instead, the PD district is based on the underlying land use designation for density and use limitations, and <br />on PD compatibility requirements regarding lot sizes and setbacks. In the PD zoning district, setbacks and <br />other typical zoning district regulations are established on a project -by -project basis through approval of a <br />C:\Granicus\Legistar5\L5\Temp\3fOc5f79-d413-4ldl-8479-flac8476495f.docx 132 2 <br />