Laserfiche WebLink
conceptual PD plan. Adopted as part of the PD zoning designation for a property, the conceptual PD plan <br />establishes the general unit arrangement, lot size, and dimensional standards for the overall project. <br />A rezoning to the PD district requires submission of a binding conceptual PD plan which, along with <br />certain PD district requirements, limits uses, and sets -forth specific development standards on the site. <br />Thus, a PD rezoning allows a unique PD district to be developed specifically for each development site. <br />In Planning staff's opinion, the PD rezoning option is an appropriate mechanism for approving a mixture <br />of residential unit types within the L-1, Low -Density Residential -1 land use designation. Unlike other <br />zoning districts, the PD zoning district allows the County to consider the appropriateness of the proposed <br />development design and project benefits as part of the rezoning request. <br />The PD Rezoning Process: <br />The PD rezoning review, approval, and development process is as follows: <br />STEP 1. Rezoning and Conceptual PD Plan Approval: Review and recommendation made by staff <br />and by the PZC. Final action taken by the BCC. <br />STEP 2. Preliminary PD Plan/Plat (combination of site plan and preliminary plat) Approval: Review <br />and recommendation made by staff. Final action taken by the PZC. Must comply with the <br />approved conceptual PD plan and any conditions imposed by the BCC at the time of PD <br />zoning approval (Step 1). <br />STEP 3. Land Development Permit (LDP) or LDP Waiver: Reviewed and issued by staff for <br />construction of subdivision improvements (road, utilities, drainage). <br />STEP 4. Building Permit(s): Reviewed and issued by staff for construction of buildings. <br />STEP 5. Final PD Plat Approval: Review and recommendation made by staff. Final action taken by <br />the BCC. <br />STEP 6. Certificate of Occupancy: Issued by staff (after inspections) for use and occupancy of <br />buildings. <br />The applicant is seeking concurrent approval of Steps 1 and 2 at this time. Once a PD conceptual plan is <br />approved, only minor modifications to the conceptual plan may be approved at a staff level. Any changes <br />proposed to an approved conceptual plan that would significantly reduce setbacks (by more than 20%), <br />intensify the site use (e.g. increase the maximum number of units), or reduce compatibility elements (e.g. <br />reduce buffering) may be approved only via a process involving public hearings held by both the PZC and <br />the BCC. <br />Proposed PD District for the Project Site: <br />The subject site has an L-1, Low -Density Residential -1 land use designation. Since the land use <br />designation controls the use of the property by limiting the zoning districts applicable to the property, any <br />rezoning must be compatible with the uses and densities allowed by the property's land use designations. <br />Once a specific PD rezoning is approved for a site, the applicable PD conceptual plan adopted as part of <br />C:\Granicus\Legistar5\L5\Temp\3fOc5f79-d413-41d1-8479-flac8476495f.docx 133 3 <br />