My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-338A
CBCC
>
Official Documents
>
1990's
>
1999
>
1999-338A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2024 1:27:00 PM
Creation date
2/6/2024 1:13:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
12/21/1999
Control Number
1999-338A
Entity Name
Summit Construction Managerment Inc.
Subject
Addendum 1 Round Island Park
Project Number
9622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />pipe shall be class 50 as determined by AWWA 0150. Fittings <br />shalt conform to AWWA Cl 10. <br />4. PAYivEl+l"T <br />A. Payment for furnishing and installing sewer mains will be on a lineal <br />foot basis. The unit price shall cover the cast of all mate als, equipment and <br />labor, fittings, dewatering, trenching, placing pipe, jointing, testing, <br />backfilling, clean -tap, grading, as-builts, and all other items necessary. <br />I <br />xv.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.