My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-080
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 10:08:57 AM
Creation date
2/27/2024 10:07:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
03/21/2000
Control Number
2000-080
Agenda Item Number
11.G4.
Entity Name
Dr. Ralph Rosato
Subject
Addendum to Health Insurance Guranty of Payment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />Q <br />O <br />n <br />The Fleet Maintenance facility shall include at least the following: <br />• A secure central fueling facility with computerized record storage. <br />• School Sus parking and storage area. <br />• Separate County and School District maintenance shops with parking and material storage <br />area. <br />• Central employee locker room, offices and dining area. <br />The Road and Bridge and Traffic Engineering Facility shall include at least the <br />following: <br />• Separate equipment storage facility. <br />• Separate or combined employee locker room and dining area, depending on the needs of <br />department. Offices shall be separate. <br />• Separate material storage, both sheltered and open. <br />• Traffic engineering sign facility. <br />• Traffic engineering signal facility. <br />• Traffic engineering pavement marking area. <br />• Conference and training room. <br />Scope of Work: <br />Programming Phase (Completed): <br />The Architect has prepared and delivered a "Site and Building Program/Design <br />Manual" dated October 15, 1998. <br />The manual contains the fol[owing: <br />A. Site Evaluation Report <br />• Site No. 1 <br />• Site No. 2 <br />This report includes the Civil Engineer's and Environmental Engineer's analysis, the <br />Architect's evaluation and schematic master planning. <br />B, Need Analysis Report -- We have revised the Cost Analysis based on the nvw <br />project scope. <br />C. Project Program - This program has been used to establish the revised project <br />scope, budget and design fees. <br />1'&IANSDNIDATAIPROJ CCTS1SWt,WAVI S.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.