Laserfiche WebLink
v <br />Q <br />O <br />n <br />The Fleet Maintenance facility shall include at least the following: <br />• A secure central fueling facility with computerized record storage. <br />• School Sus parking and storage area. <br />• Separate County and School District maintenance shops with parking and material storage <br />area. <br />• Central employee locker room, offices and dining area. <br />The Road and Bridge and Traffic Engineering Facility shall include at least the <br />following: <br />• Separate equipment storage facility. <br />• Separate or combined employee locker room and dining area, depending on the needs of <br />department. Offices shall be separate. <br />• Separate material storage, both sheltered and open. <br />• Traffic engineering sign facility. <br />• Traffic engineering signal facility. <br />• Traffic engineering pavement marking area. <br />• Conference and training room. <br />Scope of Work: <br />Programming Phase (Completed): <br />The Architect has prepared and delivered a "Site and Building Program/Design <br />Manual" dated October 15, 1998. <br />The manual contains the fol[owing: <br />A. Site Evaluation Report <br />• Site No. 1 <br />• Site No. 2 <br />This report includes the Civil Engineer's and Environmental Engineer's analysis, the <br />Architect's evaluation and schematic master planning. <br />B, Need Analysis Report -- We have revised the Cost Analysis based on the nvw <br />project scope. <br />C. Project Program - This program has been used to establish the revised project <br />scope, budget and design fees. <br />1'&IANSDNIDATAIPROJ CCTS1SWt,WAVI S.DOC <br />