My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-080
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2024 10:08:57 AM
Creation date
2/27/2024 10:07:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Addendum
Approved Date
03/21/2000
Control Number
2000-080
Agenda Item Number
11.G4.
Entity Name
Dr. Ralph Rosato
Subject
Addendum to Health Insurance Guranty of Payment
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Master Plan Phase: <br />The Architect will develop a Master Plan for each site. This plan will identify current <br />and future development needs. <br />The master plan will illustrate the following: <br />Site No. 1 (10 Acres) <br />• Existing structures to be removed. <br />• Existing structures to be maintained, including renovations and modifications. <br />• New structures. <br />• New parking, including associated roadways, driving isles and related offsite <br />roadway improvement (by Indian River County). <br />• New stormwater control and basic utilities. <br />• Fleet Maintenance Facility and Fueling Facility removal. <br />Site No. 2 (25 Acres) <br />• New structures. <br />• New parking, driveways, roadways and offsite turning lanes. <br />• Future parking and structures, <br />• Fueling facility. <br />• New stormwater control and basic utilities. <br />Schematic Design Phase: <br />After receiving authorization to proceed, we will meet with Indian River County to <br />review the outline and final program, The ArebitectlEngincer will translate the building <br />program into a schematic or conceptual design layout for both building and the site plan. <br />• Prepare a schematic design package consisting of drawings and other documents illustrating <br />a scale and the relationship of the project components. <br />• Provide. an equipment and site survey to include an inventory of the existing major <br />equipment used at the present facility. Along with the Owner, HANSON will help evaluate <br />and review the existing major equipment and determine new major cquipu,ent required for <br />this project. <br />• Prepare a preliminary Estimate of Probable Construction Cost outlining the construction <br />costs acrd including an. allowance for professional AIE fees and contingencies, allowance <br />for such other items (as charges for professional consultants) and provide an csi;iii";t� �l <br />constriction budget for the project. <br />lM4ANSON\,DATATROJECTMWKWAV] s.DOG <br />
The URL can be used to link to this page
Your browser does not support the video tag.