My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-235
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-235
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2024 2:29:36 PM
Creation date
4/26/2024 2:17:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-235
Agenda Item Number
11.C.
Entity Name
Treasure Coast Contracting
Subject
Contract for Sebastian Water Assessment Project, Phase 2D
Bid No. 2054
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />i <br />i <br />with the City of Sebastian at 561-589-5490 concerning any questions related <br />with construction in the city's road right-of-way. <br />6. An Indian River County Right -Of -Way permit is required for work performed <br />in county right-of-ways. Contact Jim Davis at 561-567-8000, ext. 245 <br />concerning any questions related with construction in the county's road right- <br />of-way. <br />7. Pavement disturbance should be avoided as much as possible. Contractor <br />should estimate appropriate number of fittings to avoid cutting pavement. <br />8. All water meters must be extended at least 2' outside invert of swale. <br />9. Water services must be at least 3' under pavement. <br />10,No flush or test water shall be discharged in front swales. All water shall be <br />discharged in side or rear drainage ditches. <br />11. Restoration length (i.e. sod, seed and mulch, pavement, etc. ) shall include <br />length over water main only. Any restoration over service tubing shall be <br />included with the cost of installing the service. <br />12. One row of sod shall be placed along edge of pavement on undeveloped lots <br />where disturbed. Final grade at edge of pavement shall be 1-2 inches below <br />edge of pavement to provide for height of sod. <br />13. Excavated areas shall be restored within 48 hours after excavation. <br />14. Contractor will be provided with copy of construction plans in AUTOCADD <br />format which includes location reference to state plane coordinates, <br />15.Anyfall addendum items to the bid package will be issued by the end of this <br />week/first of next week. <br />16.Comments from Ron Lefebure, Utilities Inspector. <br />A. Contractor should inspect all culverts prior to constructing around them. If <br />contractor identifies a deteriorated culvert, then county ai :d city inspectors <br />should be Notified to verify condition. Also, pre -construction pictures should <br />be taken to substantiate condition. <br />
The URL can be used to link to this page
Your browser does not support the video tag.