<br />SECTION 01025
<br />MEASUREMENT AND PAYMENT
<br />PART I -- GENERAL
<br />1.01 GENERAL
<br />Measurement and payment will be based upon work completed and accepted in
<br />accordance with the Contract Documents. No separate payment will be made for
<br />excavation, trenching dewatering, backfilling, leakage tests, surveying, density tests,
<br />or other incidental items of work not shown in the Agreement.
<br />9.02. EQUIPMENT AND MATERIALS IN STORAGE
<br />Partial payment for materials and equipment in proper storage at the site of die work
<br />or other approved storage site will be made for those items For wbich the Contractor
<br />has submitted paid invoices to the Engineer. The partial payment for stored materials
<br />will be 50% of the value of materials and equipment, based on reccipted bills,
<br />furnished but not tncorpor-atcd in file ►work, as determined by Engineer.
<br />1.03 MEASUREMENT
<br />A. Mobilization: Measurement shall be on a lump sum basis, and shall be limited to the
<br />following maximum amounts:
<br />ORIGINAL CONTRACT AMOUNT ($)
<br />NIAXIMUM AMOUNT OF
<br />FROM MORE THAN
<br />TO AND INCLUDING
<br />ITEM FOR MOEILIZAT70N
<br />0
<br />100,000
<br />3,000
<br />100,000
<br />500,000
<br />15,000
<br />500,000
<br />1,000,000
<br />30,000
<br />1,000,000
<br />2,000,000
<br />60,000
<br />2,000,000
<br />3,000,000
<br />90,000
<br />3,000,000
<br />4,000,000
<br />120,000
<br />4,000,000
<br />5,000,000
<br />125,000
<br />5,000,000
<br />6,000,000
<br />150,000
<br />6,000,000
<br />7,000,000
<br />175,000
<br />7,000,000
<br />10,000,000
<br />200,000
<br />10,000,000
<br />-------------
<br />250,000
<br />Should the lump sum price bid for the item Mobilization exceed the maximum
<br />permissible amount for this item, as specified herein, the bid price will be reduced to
<br />tate maximum permissible amount, and the reduced price will be used in correctly
<br />determining the total price for comparison of bids received. The cost of video taping
<br />the pre -construction condition shall be included in the lump -sum cost of
<br />Mobilization.
<br />B. Pipe: Pipe will be measured along the centerline of the pipe installed. No deduction
<br />will be made for the length of valves and fittings installed in the line. Where: the
<br />measurement terminates at a valve, bend, tec, or other fitting, the ccntcrline of the
<br />01025»t.