valve or fitting shall be the point of termination. All required pipe lining, coating,
<br />encasement material, restraining devices, and thrust blocks shall be included in the
<br />cost of the pipe.
<br />C. Fittings: Measurement of cast iron and ductile iron fittings shall be on the basis of
<br />weight. The weights used to detcm7inc the quantity installed shall be the weights of
<br />the appropriate fittings as listed in the supplier's invoice or catalog. When
<br />mechanical joint fittings are required, the weight of the gland bolts and gaskets shall
<br />not be added to the listed weight of tate fittings. Where flanged fittings are furnished,
<br />the weight of the bolts and gaskets shall not be included.
<br />D. Gate Valves and Tapping Valves: Mcasurcmcnt shall be on the basis of famishing
<br />acid installing each type and size of valve (and tapping sleeve, if applicable) required,
<br />including the valve boat, cover, and other associated items.
<br />E. Fire Hydrant Assembly: Measurement of fire hydrant assembly shall be for the
<br />actual number constructed in accordance with the Plans and Specifications, or as
<br />directed by the Engineer, at the unit price bid for the item "Fire Hydrant Assembly,"
<br />scheduled in the Form of Proposal. The unit price for "Fire Hydrant Assembly" shall
<br />include cutting bituminous paving, removal of paving courses and curb if required,
<br />excavation, furnishing and installation of 10' (G") D.I.P. water main, dry -barrel
<br />traffic hydrant, concrete foundations for hydrant, fitting, one (1) 6" diameter gate
<br />valve, concrete thrust block (reaction backing) for fire hydrant, backfill, blue
<br />reflective markers, all materials, equipment, labor and all else necessary therefore
<br />and incidental thereto.
<br />Water Service: Measurement of coater service lateral shall include ftimishing and
<br />construction of piping and appurtenances to carry and distribute coater from the crater
<br />main to the edge of the Right -of -Way for future service to individual property
<br />owners. The work slta1l include, but shall not be limited to, cutting of existing
<br />pavement cohere required, jack and bore of existing pavement where required,
<br />excavation, installation (of pipe, metcr boxes, connections and associated
<br />appurtenances), backfilling, testing, disinfection, and all restoration in kind. The
<br />services shall be of type and size specified, and shall be constructed in accordance
<br />with these Plans and Specification, or as directed by the Engineer.
<br />G. HDPE Horizontal Directional Bore: Measurement of HDPE horizontal directional
<br />bon shall include all material (including HDPE pipe), equipment, supplies, fuel,
<br />labor, sheeting and bracing, jacking and boring pits (if required), excavation,
<br />dewatering, backfilling, compaction, mechanical fittings, restoration, furnishing and
<br />installing I-IDPE pipe. Wedge type split stainless steel inserts shall be used for
<br />mechanical fittings on d" and 6" diameter pipe. A fitse welded mechanical joint
<br />adapter kit shall be used for mechimical fittings on 12" diatncter pipe. Payments
<br />shall be based on die lengths specified in the Schedule of Did Items. Directional boy:
<br />lengths specified in the Schedule of Bid Items are cstim:,ted quantities. Contractor
<br />will not be compensated for additional directional bore lengths. Additional pipe
<br />lengths will be compensated based on the lineal foot estimate of PVC pipe.
<br />H. Concrete Sidewalk and Driveway Replacement: Measurement of concrete for
<br />sidewalk and driveway replacement shall be computed using the linear feet, as
<br />measured along the pipe, or sidewalk and/or driveway rumovcd and replaced as a
<br />01025-?