My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-236
CBCC
>
Official Documents
>
2000's
>
2000
>
2000-236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 11:57:10 AM
Creation date
7/12/2024 11:38:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
08/01/2000
Control Number
2000-236
Agenda Item Number
11.G.6.
Entity Name
William Glover, Inc.
Subject
Contract for Shooting Range Buildings
Includes Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />C-1 <br />finish grade or pavement surface and shall replace, remove, relocate, protect, or temporarily <br />maintain all service connections, irrigation pipes, and traffic signal wiring. The work on the facility, <br />service connection, irrigation pipe or traffic signal wiring shall be done in a manner satisfactory to <br />the Utility, it being understood that the Utility has the option of doing such work with his own <br />forces, or permitting the work to be done by the CONTRACTOR. <br />Reference Points: <br />4.10 OWNER shall provide engineering surveys to establish reference points for construction which in <br />ENGINEER's judgment are necessary to enable CONTRACTOR to proceed with the Work. <br />CONTRACTOR shall be responsible for laying out the Work (unless otherwise specified in the <br />General Requirements), shall protect and preserve the established reference points and shall make <br />no changes or relocations without the prior written approval of OWNER. CONTRACTOR shall <br />report to ENGINEER whenever any reference point is lost or destroyed or requires relocation <br />because of necessary changes in grades or locations, and shall be responsible for the accurate <br />replacement or relocation of such reference points by professionally qualified personnel. <br />ARTId'> E3--J3ONDS AIY1! 1NSURAiNC'E <br />5.l Within ten (10) days of receipt of the Contract documents for execution, the successful bidder shall <br />furnish a Performance Bond in an amount equal to 125% of the contract price and a Payment Bond <br />in an amount equal to 100% of the contract price for the faithful performance and payment of all <br />CONTRACTOR'S obligations under the Contract Documents The CONTRACTOR shall provide <br />two separate bonds, a combined Payment and Performance Bond for 125% of the contract price is <br />not an acceptable substitute. CONTRACTOR shall furnish the bonds on the forms provided in these <br />Contract Documents in accordance with Article 5. The CONTRACTOR is required at all times to <br />have valid Performance and Payment Bonds in force covering the work being performed. A failure <br />to have such bonds in force at any time shall constitute a default on the part of the CONTRACTOR, <br />If the surety writing the Performance and Payment Bonds becomes disqualified, then this shall <br />automatically constitute a failure on the part of the CONTRACTOR to meet the above requirements. <br />All bonds shall be in the forms prescribed by Law or Regulation or by the Contract Documents and <br />be executed by such surctics as are named in the current list of"Companies Holding Certificates of <br />Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as <br />published in Circular 570(amended) by the Audit Staff Bureau of Accounts, U.S. Treasury <br />Department. All Bonds signed by an agent must be accompanied by a certified copy of the authority <br />.:1 to act. <br />5.2 If the surety on any Bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent <br />or its right to do business is terminated in any state where any part of the Project is located or it <br />ceases to meet the requirements of paragraph 5.1, CONTRACTOR shall within five (5) days <br />thereafter substitute another Bond and Surety, both of which must be acceptable to OWNER. <br />In lieu of the Performance and Payment Bonds, the CONTRACTOR may furnish an alternative form <br />of security in the form of cash, money order, certified check, cashier's check, irrevocable letter of <br />credit or a security as listed in fart II of F.S. Chapter 625. Any such alternative form of security <br />shall be for the same purposes, and be for the some amount and subject to the some conditions as <br />those applicable to the bond otherwise required. The determination of the value of an alternative <br />form of security shall be made by the OWNER. Such bonds shall continue in effect for one (1) year <br />after completion and acceptance of the work. <br />CONTitACTOR's. Liability Insurance: <br />5.3 Insurance - General: CONTRACTOR shall not commence work under this contract until he has <br />GENERAL CONDITIONS <br />GC - ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.