My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/1/1996
CBCC
>
Meetings
>
1990's
>
1996
>
10/1/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:51 PM
Creation date
6/17/2015 8:50:04 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/01/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � s <br />10. DRI Binding Letter: Based upon section 916.04, the Board of <br />County Commissioners may require the developer to obtain a <br />binding letter of interpretation or a clearance letter from <br />the Department of Community Affairs (DCA), to provide <br />assurances that the proposal does not constitute a DRI <br />(development of regional impact). The developer obtained a <br />clearance letter from the DCA for the original project. Since <br />this PD rezoning/conceptual plan request proposes no increase <br />in commercial building area, it is staff's opinion that the <br />county should not require the applicant to obtain a new <br />clearance letter or binding letter of interpretation. <br />11. Landscape Plan & Buffers: As a condition of the original Wal- <br />Mart approval, there is a 25' Type C buffer required along the <br />project site's SR 60 frontage and a 25' Type B buffer with an <br />8' tall concrete panel wall required along that project's <br />southern property line. These buffer types will be continued <br />along the 6.19 acre site's SR 60 frontage and the southern <br />property line, respectively. The remainder of the site will <br />comply with the requirements of Chapter 926. <br />In staff's opinion, the applicant should extend the 8' tall <br />concrete panel wall along the entire south property line to <br />the site's east property line. The wall would substitute for <br />the hedge material required in the Type "B" buffer. However, <br />the applicant is proposing to extend the 8' high wall 240' <br />eastward, which will cover only a portion of the project's <br />371.61' of canal (southern property line) frontage. It is <br />staff's position that the wall needs to be extended to the <br />east property line to prevent both noise and light at the back <br />of the store and at the store's loading area from negatively <br />impacting the residential area to the south. ' However, the <br />applicant does not agree with staff's position and is <br />intending to provide a landscape feature in this area. <br />12. Utilities: The project will be connected to county water and <br />sewer. This meets both concurrency and utilities connection <br />matrix requirements. These utility provisions have been <br />approved by the County's Department of Utility Services and <br />the State Health Department. <br />13. Environmental Issues: The 6.19 acre subject property consists <br />of mostly a remnant citrus grove, which now includes native <br />plants and some nuisance exotics. Based on an inspection by <br />the environmental planning staff, the site does not qualify as <br />native upland community; therefore, the native upland set- <br />aside requirement does not apply. The environmental planning <br />staff has also verified that there are no wetlands on the <br />subject site; therefore, there are no wetland requirements. <br />There is a native upland conservation easement on a portion of <br />the subject site that was used to mitigate destruction of <br />native uplands on the site of the existing Wal-Mart store. <br />The proposed superstore building expansion will extend into <br />the area of the existing conservation easement; therefore, the <br />applicant will need to have the easement released and will <br />need to mitigate for the loss of the conservation area. This <br />can be achieved either by preservation of upland native plant <br />community area off-site or payment of a fee -in -lieu of <br />preservation. Prior to site plan release, the applicant will <br />need to satisfy the native upland set-aside requirement to the <br />satisfaction of environmental planning staff. <br />14. Dedications & Improvements: The applicant will be making <br />several off-site improvements. One improvement will involve <br />45 <br />OCTOBER 1, 1996 BOOK 99 �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.