Laserfiche WebLink
Exhibit A <br />• Resources and equipment <br />• Crisis Communications <br />• Emergency Procurement <br />• Training and Exercises <br />AARCADIS <br />Appendices include key information for emergency response including an internal and external contact list, <br />system maps and assembly point diagrams, equipment and resources, incident specific response procedures <br />(ISRPs), ICS Forms, references, and resources. A Draft ERP will be developed based on the plan outline <br />determined in Task 3.1. The ERP will incorporate information collected in Tasks 3.1 and 3.2. The Draft ERP will <br />include the following elements: <br />• Overview of the water system, facility information and maps <br />• Emergency contact list (internal and external) <br />• Department's organization structure: review existing response organizational chart and response <br />protocols in place <br />• ICS roles and responsibilities, concept of operations: review and describe response related operations <br />and procedures <br />• IMT: verify Department organization and titles of staff who would participate on the IMT <br />• EALs: verify initial response actions and continuing operations for the Department and align with County <br />response levels <br />• Document lessons learned from emergency event occurrences to enhance response and recovery <br />• Communication procedures (internal and external) and notification and reporting protocol <br />• Emergency procurement <br />• ISRPs (up to 10 ISRPs): providing response action procedures based on threats and hazards identified in <br />the RRA. These action plans will be structured in a "rip and run" format for ease of access in an <br />emergency. The ISRPs can be used to train and guide staff in rapid response procedures for specific <br />emergency scenarios. <br />• Equipment, spare parts, supply, and resources list (including generator list and review of power <br />provisions) <br />• Recovery operations and planning <br />• Information regarding FEMA assistance and cost data tracking <br />• Detection strategies and detection technology in place <br />• Mitigation actions (integration of RRA mitigation measures) <br />• Training and exercises <br />• Procedures and forms <br />• References and resources <br />A Draft plan will be submitted within six weeks following the site visit. The Department will have a three-week <br />review and comment period. Arcadis will facilitate a two-hour virtual ERP review meeting to obtain the ERP <br />feedback, comments, and questions. A revised Draft ERP will be submitted that includes changes, comments, <br />and recommendations from the Department. <br />Deliverables: <br />1. Electronic Draft ERP <br />2. Two-hour virtual comment review meeting <br />3. Electronic revised Draft ERP <br />Task 3.4 — Tabletop Exercise <br />www.arcadis.corn 11 <br />