My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-214
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:55:54 PM
Creation date
10/15/2024 2:50:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/10/2024
Control Number
2024-214
Agenda Item Number
8.Z.
Entity Name
Arcadis U.S., Inc.
Subject
Engineering Services Work Order 01 for Partial Release of Easement at 11225 US Highway 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />04ARCADIS <br />To enhance the viability of the ERP, an onsite, in person four-hour discussion -based tabletop exercise (TTX) will <br />be designed and facilitated by Arcadis in conjunction with Department staff and applicable stakeholders following <br />Homeland Security Exercise and Evaluation Program (HSEEP) guidelines. Arcadis will collaborate with <br />Department staff over the course of three, two-hour virtual planning meetings to design the TTX (planning <br />meeting members will not be participating in the exercise). These planning meetings will develop specific exercise <br />objectives, scenarios, capabilities, and critical tasks for the exercise based the revised draft ERP. TTX planning <br />meeting discussions will be summarized in an Exercise Development Worksheet and provided to the Department <br />following each meeting. <br />The TTX will be conducted in person and include an Arcadis facilitator, evaluators, and support staff, and <br />Department observers, evaluators, and planners. The TTX will consist of multi -media modules that present <br />scenario progression followed by targeted questions related to steps and actions to take based on the revised <br />draft ERP. TTX materials and forms will be developed by Arcadis in coordination with the Department and <br />customized through the TTX planning process. Each exercise participant will be provided a situation manual to <br />follow along and use during TTX play and participant feedback forms to comment on the exercise and the ERP. <br />Feedback forms will be collected at the end of the exercise and compiled with observations and evaluator ratings <br />into a draft after -action report (AAR) of best practices, lessons learned, and improvement plan. The draft AAR will <br />be submitted to the Department for review and comment. <br />Arcadis will facilitate a two-hour, virtual AAR review meeting with the Department to review the draft AAR. Arcadis <br />will solicit input, identify, and obtain consensus for AAR improvement plan revisions and ERP enhancements. <br />Arcadis will incorporate Department AAR review meeting comments and deliver a final AAR. <br />Deliverables: <br />1. Three, two-hour remote TTX planning meeting summaries <br />2. TTX presentation and materials: situation manuals, evaluator sheets, and participant feedback forms <br />3. Electronic Draft AAR <br />4. Two-hour AAR meeting summary <br />5. Electronic Final AAR <br />Task 3.5 — Final ERP <br />A final ERP addressing Department comments based on the TTX AAR and associated review meeting will be <br />prepared and submitted to the Department. The ERP is designed to meet AWIA compliance requirements and <br />current USEPA expectations in the event of a compliance and inspection audit. The Department will be <br />responsible for certification of completion of the ERP to USEPA by the established regulatory deadline of <br />September 30, 2025. <br />Deliverable: <br />1. Electronic Final ERP <br />Task 4 — Water Master Planning Project Integration Support <br />Arcadis will provide support to the Department with risk-based prioritization and integration of selected water <br />system mitigation measures, initiatives, and projects in the Department's Water Master Plan efforts. The team <br />will provide the Department with a a prioritized strategy for projects, programs, and short -and long-term efforts <br />based on risk reduction and enhanced resilience benefits for inclusion in the Water Master Plan and long-term <br />planning efforts. This support will include development and submittal of the draft memorandum for Department <br />WWW,WC1d OI5.00(ll 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.