My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-248
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:16:51 PM
Creation date
10/21/2024 2:11:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/24/2024
Control Number
2024-248
Agenda Item Number
12.J.1.
Entity Name
HDR Engineering, Inc.
Subject
Consulting Engineering Services Agreement for Integrated Waster Master Plan; IRCDUS 00.23.547
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTANT and COUNTY staff. Progress reports shall accompany the <br />invoices submitted to the COUNTY each month. <br />Task 1 Assumptions, Workshops, and Deliverables <br />Assumptions: <br />Kickoff Meeting to be attended by up to eight (8) CONSULTANT staff. <br />Progress meetings will be attended by up to three (3) CONSULTANT staff. <br />Meetings/Workshops: <br />• One (1) two-hour in-person Project Kickoff Meeting. <br />• Twenty (20) monthly progress meetings with COUNTY to review progress of <br />scope, schedule, and budget. <br />Deliverables: <br />• Kickoff agenda and meeting minutes <br />• Monthly invoices with progress reports <br />Task 2 Build the Vision <br />2.1 Initial Data Request and Review <br />CONSULTANT will collect and review existing utility information, data, and reports that <br />are foundational for the IWMP. Specific tasks will include the following: <br />2.1.1 Data Request <br />CONSULTANT will work with the COUNTY to collect and organize existing treatment, <br />collection, distribution, and management data, including operational, asset condition, <br />and performance data. The CONSULTANT will develop a data request to include the <br />following general items: <br />• Water meter billing data <br />• Sewer flow monitoring data <br />• Facility flows, loads, and capacity data (i.e. finished water pumping data, <br />influent & effluent flow and loading data, unit process capacities) <br />• Pump curves for all major high service pump stations, booster pump stations, <br />wastewater lift stations, and repump stations <br />• Existing hydraulic models for drinking water and reuse water distribution and <br />wastewater collection <br />• Drinking water distribution geospatial data, including size and material <br />• Reuse distribution geospatial data, including size and material <br />• Wastewater collection geospatial data, including size and material <br />• Water/Wastewater Treatment Process Models <br />• Vertical asset inventory <br />• Condition assessment data (linear and vertical assets) <br />• Capital and Operations and Maintenance (O&M) historical expenditures and <br />budgets <br />• Previous master plans for drinking water, wastewater, and reuse systems <br />• Treatment performance benchmarking data (e.g., process performance, <br />operational goals, finished water targets, system pressures, etc.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.