Laserfiche WebLink
CONSULTANT will develop a draft version of IWMP Module 2: Existing System <br />Performance based on findings from detailed document reviews and workshop <br />discussions. The purpose of IWMP Module 2 will be to: <br />• Summarize existing system performance and capacity for both vertical and <br />linear assets. <br />• Review findings from desktop condition assessments. <br />• Highlight priority areas for focused condition assessment, capacity <br />enhancements, rehabilitation, and replacement. <br />• Discuss strengths and vulnerabilities regarding resilience. <br />• Review existing staffing capacity and guide planning for future staffing <br />expansion. <br />CONSULTANT will provide Module 2 as a draft only as part of this task. COUNTY <br />review comments will be tracked in an Excel spreadsheet and incorporated into the Pre - <br />Final and Final versions of the IWMP to be compiled in Task 7.4. <br />Task 3 Assumptions, Workshops, and Deliverables <br />Assumptions: <br />• COUNTY will provide all necessary personnel to accompany CONSULTANT <br />during four-week vertical condition assessment. <br />• COUNTY personnel will provide input regarding asset performance during <br />five-day vertical condition assessment. <br />• Vertical condition assessment will consist of visual and auditory observations <br />only. CONSULTANT will not use any instrumentation as part of condition <br />assessment. <br />• Development of RUL, LOF, COF, and risk estimates for linear infrastructure <br />will be based purely on desktop assessment. <br />• Level of CONSULTANT effort assumes that COUNTY GIS is up to date. No <br />updates to GIS are included. <br />• Hydrant flow tests for model calibration will be performed by COUNTY with <br />CONSULTANT personnel observing only. COUNTY is responsible for setup, <br />cleanup, traffic control, access, and customer notification ahead of hydrant <br />testing, as needed. <br />• COUNTY will install all temporary flow meters and instruments for calibration <br />and will collect data on a monthly basis for collection system and reuse <br />system calibration. <br />• Regulatory meetings and negotiations needs will be identified and addressed <br />through IWMP development. <br />• Regulatory agency coordination will remain active throughout the duration of <br />the project (i.e., meetings will be reserved for as -needed coordination with <br />FDEP throughout the development of the IP framework). <br />Meetings/Workshops: <br />• Up to three (3) meetings with FDEP <br />• Asset Management & Condition Assessment Workshop (4 hours, in-person) <br />• Resilience Workshop (2 hours, in-person) <br />• Staffing Workshop (2 hours, in-person) <br />• Existing System Performance Workshop (4 hours, in-person) <br />11 <br />