My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-217
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 2:07:01 PM
Creation date
10/24/2024 2:02:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/10/2024
Control Number
2024-217
Agenda Item Number
15.B.2.
Entity Name
Jones Edmunds & Associated, Inc.
Subject
Work Order No.2 for 74th Avenue SW Widening Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ronnie Jones, BSCE, A.M. ASCE <br />August 23, 2024 <br />Page 4 <br />■ General Notes. <br />• Preliminary Alignment Plan. <br />• Site Entrance Layout Plan <br />■ Site Entrance Grading Plan <br />■ Typical Sections. <br />■ Grading and Drainage Road Plans <br />Jones Edmunds will submit the 30% Design Plans to the County for their review and <br />comment. Thereafter, Jones Edmunds will meet with the County via TEAMS or Zoom to <br />review the Plans and receive comments regarding the design. <br />Deliverables <br />■ 30% Plans: electronic copy (PDF) and 1 full-size set of printed plan sheets. <br />75% DESIGN <br />Jones Edmunds will develop 75% Design Plans and Draft Technical Specifications by <br />incorporating mutually agreed -on comments from the 30% Design. We will prepare an <br />EOPCC. <br />Jones Edmunds will work with the County on the selection of a camera or licensed plate <br />reader to be installed with the new gate. <br />The 75% Plans will include the sheets from the 30% Design plus the following sheets: <br />■ Plan and Profile Sheets. <br />■ Roadway Cross -Sections. <br />■ Grading and Drainage Plans <br />■ Utility Relocation Plans <br />■ Wetland Impact Plans. <br />■ Erosion- and Sediment -Control Plans. <br />■ Maintenance of Traffic Plans <br />■ Pavement Marking Plan <br />■ Details <br />Jones Edmunds will submit the 75% Design Plans, Draft Specifications, and EOPCC to the <br />County for their review and comment. Thereafter, we will meet with the County to review <br />the Plans and receive comments regarding the design. <br />Deliverables <br />■ 75% Plans: electronic copy (PDF) and 1 full-size set of printed plan sheets. <br />■ 75% Draft Technical Specifications: electronic copy (PDF). <br />■ EOPCC: electronic copy (PDF). <br />The County -reviewed and approved 75% Plans will be used for permitting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.