Laserfiche WebLink
Ronnie Jones, BSCE, A.M. ASCE <br />August 23, 2024 <br />Page 5 <br />100% DESIGN <br />Jones Edmunds will prepare Final Construction Plans, Technical Specifications by <br />incorporating relevant, in -Scope County comments from the 75% Design, and the Final <br />EOPCC. The Final Construction Plans and Technical Specifications will be used for bidding <br />and construction. <br />The 100% Plans will include the sheets from the 75% Design, any County and permit <br />agency comments, plus the following sheets: <br />■ Drainage Ditch Profiles. <br />• Construction Details. <br />Deliverables <br />• 100% Plans (signed -and -sealed): electronic copy (PDF). <br />■ One full-size set of (signed and sealed) printed plan sheets. <br />• 100% Technical Specifications (signed -and -sealed): electronic copy (PDF). <br />■ EOPCC: electronic copy (PDF). <br />UTILITY COORDINATION <br />During the design process, Jones Edmunds will coordinate with utility providers impacted by <br />the project improvements. We will communicate and meet with the utility providers to <br />confirm that they relocate their facilities if applicable in a timely manner. We cannot control <br />the timeliness of utility relocations by others. As part of this Scope of Services, we will call <br />out minor utility adjustments. <br />TASK 4 — PERMITTING <br />Jones Edmunds will schedule and participate in a pre -application meeting with SFWMD. <br />Jones Edmunds will use the County -approved 75% Design Plans to prepare the permit <br />applications. We will prepare the permit documentsfor County signature and will submit the <br />permit packages to the appropriate agencies. <br />No record exists of any delineated wetlands on this site. <br />The following deliverables will be provided: <br />■ SFWMD General Environmental Resource Permit (ERP) application. <br />■ County Transportation Permit application. <br />■ Indian Farms Water Control District Connection Permit. <br />■ Responses to Request for Additional Information (RAI)s <br />TASK 5 — BIDDING <br />Jones Edmunds will assist the County during the bidding and award process for the project <br />as follows: <br />