My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-217
CBCC
>
Official Documents
>
2020's
>
2024
>
2024-217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2024 2:07:01 PM
Creation date
10/24/2024 2:02:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/10/2024
Control Number
2024-217
Agenda Item Number
15.B.2.
Entity Name
Jones Edmunds & Associated, Inc.
Subject
Work Order No.2 for 74th Avenue SW Widening Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ronnie Jones, BSCE, A.M. ASCE <br />August 23, 2024 <br />Page 5 <br />100% DESIGN <br />Jones Edmunds will prepare Final Construction Plans, Technical Specifications by <br />incorporating relevant, in -Scope County comments from the 75% Design, and the Final <br />EOPCC. The Final Construction Plans and Technical Specifications will be used for bidding <br />and construction. <br />The 100% Plans will include the sheets from the 75% Design, any County and permit <br />agency comments, plus the following sheets: <br />■ Drainage Ditch Profiles. <br />• Construction Details. <br />Deliverables <br />• 100% Plans (signed -and -sealed): electronic copy (PDF). <br />■ One full-size set of (signed and sealed) printed plan sheets. <br />• 100% Technical Specifications (signed -and -sealed): electronic copy (PDF). <br />■ EOPCC: electronic copy (PDF). <br />UTILITY COORDINATION <br />During the design process, Jones Edmunds will coordinate with utility providers impacted by <br />the project improvements. We will communicate and meet with the utility providers to <br />confirm that they relocate their facilities if applicable in a timely manner. We cannot control <br />the timeliness of utility relocations by others. As part of this Scope of Services, we will call <br />out minor utility adjustments. <br />TASK 4 — PERMITTING <br />Jones Edmunds will schedule and participate in a pre -application meeting with SFWMD. <br />Jones Edmunds will use the County -approved 75% Design Plans to prepare the permit <br />applications. We will prepare the permit documentsfor County signature and will submit the <br />permit packages to the appropriate agencies. <br />No record exists of any delineated wetlands on this site. <br />The following deliverables will be provided: <br />■ SFWMD General Environmental Resource Permit (ERP) application. <br />■ County Transportation Permit application. <br />■ Indian Farms Water Control District Connection Permit. <br />■ Responses to Request for Additional Information (RAI)s <br />TASK 5 — BIDDING <br />Jones Edmunds will assist the County during the bidding and award process for the project <br />as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.