My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-026
CBCC
>
Official Documents
>
2000's
>
2001
>
2001-026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 10:40:12 AM
Creation date
2/20/2025 10:34:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
01/30/2001
Control Number
2001-026
Entity Name
Ranger Construction
Subject
Contract for Dune Restoration Project
Project Number
IRC-3041
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
256
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br />do <br />C <br />D �® <br />To minimize damage and traffic congestion, trucks shall limit their north -south route to I-95, <br />USI and US AIA whenever possible. The final truck route shall be approved by the Engineer <br />at the pre -construction meeting. <br />16. Material Placement <br />General: The Contractor shall transport and deposit the sand fill material in the areas shown <br />' on the plans. The Contractor shall place the materials within the section and limits as shown <br />on the drawings. <br />The Contractor shall construct and stabilize, as deemed necessary, an access road for use by <br />the dump trucks transporting material from the pit location to the construction site by the <br />Contractor. The final route for the access road will be decided by the Contractor and <br />Engineer. Every effort shall be made to limit clearing for the access road to areas of exotic <br />vegetation. The Contractor shall avoid disturbing native vegetation wherever possible, and <br />shall obtain permission from the Engineer before impacting any native vegetation. <br />t <br />Dump trucks transporting fill will enter the construction area using the access areas. Fill will <br />( be deposited on the beach at the access points, and the trucks will return along the access area <br />L . - exiting where they entered the site. The Contractor shall use bulldozers or similar equipment <br />to move the fill material from the access points into place on the beach. Compaction of the <br />fill shall be avoided whenever possible. <br />L: <br />The material shall be placed in a high berm along the dune until all fill material has been <br />transported to the site. During final dressing the fill shall be brought to rest on the beach to <br />the grades and cross-section indicated on the plans unless otherwise provided for herein or <br />+ directed by the Engineer. The Contractor shall schedule its operations to take advantage of <br />the tide so that placement is completed during optimum times or as directed. The Contractor <br />shall not stockpile any equipment or debris on the beach except as approved by the Engineer. <br />The beach is subject to changes and the elevations on the beach at the time the work is done <br />t _ may vary from the elevations shown on the drawings. The Engineer reserves the right to vary <br />the width or grade of the berm from the grades shown on the plans in order to establish an <br />uniform beach for the entire length of the project. The beach fill cross sections shown on the <br />drawings are for the purpose of estimating the amount of fill needed and will be used by the <br />Engineer in making any change in the grades. The Contractor shall monitor the excavation <br />f and fill operations and shall notify the Engineer if and when the quantity to be placed appears <br />L to be excessive for the designated project site. <br />j Prior to placement of fill, the Contractor shall remove all driftwood, plastics, and similar <br />1 debris from the fill material or lying within the foundation limits of the beach fill section. All <br />materials removed shall be disposed of in areas provided by and at the expense of the <br />Contractor and approvedby the Engineer. Grading and other construction equipment will not <br />be permitted outside the work areas shown on the plans except for ingress and egress to and <br />from the site. <br />Grade Stakes: Wooden grade stakes will not be allowed. The material used for grade stakes <br />shall be metal pipes that can be completely removed intact by the Contractor after placement <br />of the fill. <br />TP 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.